My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:16:25 PM
Creation date
5/23/2022 2:52:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2019 SOIL MGMT PLAN (JULY-REVISED)
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />TABLE OF CONTENTS <br /> <br /> iv <br /> <br /> <br />SECTION 1 - SWPPP REQUIREMENTS ............................................................................................................. 1 <br />SECTION 1.1 - INTRODUCTION ................................................................................................................. 1 <br />SECTION 1.2 - PERMIT REGISTRATION DOCUMENTS ................................................................... 2 <br />SECTION 1.3 - SWPPP AVAILABILITY AND IMPLEMENTATION ................................................ 3 <br />SECTION 1.4 - SWPPP AMENDMENTS ..................................................................................................... 3 <br />SECTION 1.5 - RETENTION OF RECORDS ............................................................................................ 5 <br />SECTION 1.6 - REQUIRED NON-COMPLIANCE REPORTING ...................................................... 5 <br />SECTION 1.7 - ANNUAL REPORTING ...................................................................................................... 5 <br />SECTION 1.8 - CHANGES TO PERMIT COVERAGE ........................................................................... 6 <br />SECTION 1.9 - NOTICE OF TERMINATION .......................................................................................... 6 <br />SECTION 2 - PROJECT INFORMATION ......................................................................................................... 7 <br />SECTION 2.1 - PROJECT AND SITE DESCRIPTION............................................................................ 7 <br />SECTION 2.2 - STORMWATER RUN-ON FROM OFFSITE AREAS ................................................. 7 <br />SECTION 2.3 - FINDINGS OF THE CONSTRUCTION SITE SEDIMENT AND <br />RECEIVING WATER RISK DETERMINATION ....................................................... 8 <br />SECTION 2.4 - CONSTRUCTION SCHEDULE ........................................................................................ 9 <br />SECTION 2.5 - POTENTIAL CONSTRUCTION SITE POLLUTANT SOURCES .......................... 9 <br />SECTION 2.6 - IDENTIFICATION OF NON-STORMWATER DISCHARGES ........................... 10 <br />SECTION 3 - BEST MANAGEMENT PRACTICES ....................................................................................... 11 <br />SECTION 3.1 - SCHEDULE FOR BMP IMPLEMENTATION ........................................................... 11 <br />SECTION 3.2 - EROSION AND SEDIMENT CONTROL ................................................................... 11 <br />SECTION 3.3 - NON-STORMWATER AND MATERIALS MANAGEMENT ............................... 13 <br />SECTION 3.4 - POST-CONSTRUCTION STORMWATER MANAGEMENT MEASURES ....... 14 <br />SECTION 4 - BMP INSPECTION, MAINTENANCE, AND RAIN EVENT ACTION PLANS ........ 15 <br />SECTION 4.1 - BMP INSPECTION AND MAINENTANCE .............................................................. 15 <br />SECTION 5 - TRAINING ....................................................................................................................................... 16 <br />SECTION 6 - RESPONSIBLE PARTIES AND OPERATORS ..................................................................... 16 <br />SECTION 6.1 - RESPONSIBLE PARTIES ................................................................................................. 16 <br />SECTION 6.2 - CONTRACTOR LIST ......................................................................................................... 16 <br />SECTION 7 - CONSTRUCTION SITE MONITORING PROGRAM ........................................................ 17 <br />SECTION 7.1 - PURPOSE .............................................................................................................................. 17 <br />SECTION 7.2 - APPLICABILITY OF PERMIT REQUIREMENTS ................................................... 17
The URL can be used to link to this page
Your browser does not support the video tag.