My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:16:25 PM
Creation date
5/23/2022 2:52:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2019 SOIL MGMT PLAN (JULY-REVISED)
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Order <br />2009-0009-DWQ amended by 2010-0014-DWQ & 2012-0006-DWQ <br /> 14 <br /> <br />IT IS HEREBY ORDERED that all dischargers subject to this General Permit <br />shall comply with the following conditions and requirements (including all <br />conditions and requirements as set forth in Attachments A, B, C, D, E and F)6: <br /> <br />II. CONDITIONS FOR PERMIT COVERAGE <br /> <br />A. Linear Underground/Overhead Projects (LUPs) <br /> <br />1. Linear Underground/Overhead Projects (LUPs) include, but are not <br />limited to, any conveyance, pipe, or pipeline for the transportation of <br />any gaseous, liquid (including water and wastewater for domestic <br />municipal services), liquescent, or slurry substance; any cable line or <br />wire for the transmission of electrical energy; any cable line or wire for <br />communications (e.g. telephone, telegraph, radio or television <br />messages); and associated ancillary facilities. Construction activities <br />associated with LUPs include, but are not limited to, (a) those activities <br />necessary for the installation of underground and overhead linear <br />facilities (e.g., conduits, substructures, pipelines, towers, poles, cables, <br />wires, connectors, switching, regulating and transforming equipment, <br />and associated ancillary facilities); and include, but are not limited to, <br />(b) underground utility mark-out, potholing, concrete and asphalt <br />cutting and removal, trenching, excavation, boring and drilling, access <br />road and pole/tower pad and cable/wire pull station, substation <br />construction, substructure installation, construction of tower footings <br />and/or foundations, pole and tower installations, pipeline installations, <br />welding, concrete and/ or pavement repair or replacement, and <br />stockpile/borrow locations. <br /> <br />2. The Legally Responsible Person is responsible for obtaining coverage <br />under the General Permit where the construction of pipelines, utility <br />lines, fiber-optic cables, or other linear underground/overhead projects <br />will occur across several properties unless the LUP construction <br />activities are covered under another construction storm water permit. <br /> <br />3. Only LUPs shall comply with the conditions and requirements in <br />Attachment A, A.1 & A.2 of this Order. The balance of this Order is not <br />applicable to LUPs except as indicated in Attachment A. <br /> <br /> <br /> <br /> <br /> <br /> <br />6 These attachments are part of the General Permit itself and are not separate documents that are capable <br />of being updated independently by the State Water Board. <br />
The URL can be used to link to this page
Your browser does not support the video tag.