My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:16:25 PM
Creation date
5/23/2022 2:52:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2019 SOIL MGMT PLAN (JULY-REVISED)
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Order <br />2009-0009-DWQ amended by 2010-0014-DWQ & 2012-0006-DWQ <br /> 18 <br />3. The discharger shall continue coverage under the General Permit for <br />any parcel that has not achieved “Final Stabilization” as defined in <br />Section II.D. <br /> <br />4. When an LRP with active General Permit coverage transfers its LRP <br />status to another person or entity that qualifies as an LRP, the existing <br />LRP shall inform the new LRP of the General Permit’s requirements. <br />In order for the new LRP to continue the construction activity on its <br />parcel of property, the new LRP, or the new LRP’s approved signatory, <br />must submit PRDs in accordance with this General Permit’s <br />requirements. <br /> <br />D. Conditions for Termination of Coverage <br /> <br />1. Within 90 days of when construction is complete or ownership has <br />been transferred, the discharger shall electronically file a Notice of <br />Termination (NOT), a final site map, and photos through the State <br />Water Boards SMARTS system. Filing a NOT certifies that all General <br />Permit requirements have been met. The Regional Water Board will <br />consider a construction site complete only when all portions of the site <br />have been transferred to a new owner, or all of the following conditions <br />have been met: <br /> <br />a. For purposes of “final stabilization,” the site will not pose any <br />additional sediment discharge risk than it did prior to the <br />commencement of construction activity; <br /> <br />b. There is no potential for construction-related storm water pollutants <br />to be discharged into site runoff; <br /> <br />c. Final stabilization has been reached; <br /> <br />d. Construction materials and wastes have been disposed of properly; <br /> <br />e. Compliance with the Post-Construction Standards in Section XIII of <br />this General Permit has been demonstrated; <br /> <br />f. Post-construction storm water management measures have been <br />installed and a long-term maintenance plan7 has been established; <br />and <br /> <br />g. All construction-related equipment, materials and any temporary <br />BMPs no longer needed are removed from the site. <br /> <br />7 For the purposes of this requirement a long-term maintenance plan will be designed for a minimum of five <br />years, and will describe the procedures to ensure that the post-construction storm water management <br />measures are adequately maintained.
The URL can be used to link to this page
Your browser does not support the video tag.