My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:16:25 PM
Creation date
5/23/2022 2:52:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2019 SOIL MGMT PLAN (JULY-REVISED)
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT C <br />2009-0009-DWQ as amended by 2010-0014-DWQ & 2012-2006-DWQ <br />6 <br />storm events, to identify and record BMPs that need maintenance to <br />operate effectively, that have failed, or that could fail to operate as <br />intended. Inspectors shall be the QSP or be trained by the QSP. <br /> <br />3. Upon identifying failures or other shortcomings, as directed by the <br />QSP, Risk Level 1 dischargers shall begin implementing repairs or <br />design changes to BMPs within 72 hours of identification and complete <br />the changes as soon as possible. <br /> <br />4. For each inspection required, Risk Level 1 dischargers shall complete <br />an inspection checklist, using a form provided by the State Water <br />Board or Regional Water Board or in an alternative format. <br /> <br />5. Risk Level 1 dischargers shall ensure that checklists shall remain <br />onsite with the SWPPP and at a minimum, shall include: <br /> <br />a. Inspection date and date the inspection report was written. <br /> <br />b. Weather information, including presence or absence of <br />precipitation, estimate of beginning of qualifying storm event, <br />duration of event, time elapsed since last storm, and approximate <br />amount of rainfall in inches. <br /> <br />c. Site information, including stage of construction, activities <br />completed, and approximate area of the site exposed. <br /> <br />d. A description of any BMPs evaluated and any deficiencies noted. <br /> <br />e. If the construction site is safely accessible during inclement <br />weather, list the observations of all BMPs: erosion controls, <br />sediment controls, chemical and waste controls, and non-storm <br />water controls. Otherwise, list the results of visual inspections at all <br />relevant outfalls, discharge points, downstream locations and any <br />projected maintenance activities. <br /> <br />f. Report the presence of noticeable odors or of any visible sheen on <br />the surface of any discharges. <br /> <br />g. Any corrective actions required, including any necessary changes <br />to the SWPPP and the associated implementation dates. <br /> <br />h. Photographs taken during the inspection, if any. <br /> <br />i. Inspector’s name, title, and signature. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.