My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:16:25 PM
Creation date
5/23/2022 2:52:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2019 SOIL MGMT PLAN (JULY-REVISED)
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Former Pilkington North America Site iii Health and Safety Plan <br /> EKI B90047.00 <br /> <br />Table of Contents <br />1. INTRODUCTION ...................................................................................................... 1 <br />1.1 Multi‐Employer Worksite Procedures ................................................................. 1 <br />1.2 Key Health and Safety Personnel ......................................................................... 2 <br />2. TASK / OPERATION SAFETY AND HEALTH PLAN ...................................................... 3 <br />2.1 Site Description and History ................................................................................ 3 <br />2.2 Summary of Prior Subsurface Investigations Conducted on the Site .................. 3 <br />2.3 Proposed Field Activities ...................................................................................... 5 <br />3. POTENTIAL PHYSICAL HAZARDS .............................................................................. 5 <br />3.1 Operating Equipment ........................................................................................... 5 <br />3.2 Noise .................................................................................................................... 6 <br />3.3 Vehicular Traffic ................................................................................................... 6 <br />3.4 Open Excavations and Confined Spaces .............................................................. 7 <br />3.5 Heat Stress and Heat Stroke ................................................................................ 8 <br />3.6 Underground and Overhead Utilities ................................................................ 10 <br />3.7 Fire Protection ................................................................................................... 10 <br />4. POTENTIAL CHEMICAL HAZARDS ........................................................................... 11 <br />4.1 Chemicals of Concern ........................................................................................ 11 <br />4.2 Potential Exposure Routes ................................................................................. 11 <br />4.3 Minimization of Potential Chemical Exposure ................................................... 12 <br />4.4 Community Hazard Analysis .............................................................................. 12 <br />5. PROTECTIVE ACTIONS ........................................................................................... 12 <br />5.1 Personal Protective Equipment ......................................................................... 12 <br />5.2 Work Zones ........................................................................................................ 13 <br />5.3 Monitoring ......................................................................................................... 14 <br />5.4 Decontamination ............................................................................................... 15 <br />5.5 Waste Management .......................................................................................... 16 <br />5.6 Training .............................................................................................................. 16 <br />5.7 Medical Monitoring ........................................................................................... 16 <br />5.8 Site Facilities....................................................................................................... 16 <br />5.9 Safety Briefings .................................................................................................. 17 <br />6. EMERGENCY RESPONSE PLAN ............................................................................... 17 <br />7. GENERAL WORK RULES ......................................................................................... 17 <br />SIGNATURES ............................................................................................................... 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.