My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
ARCHIVED REPORTS_2019 SOIL MGMT PLAN (JULY-REVISED)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 3:16:25 PM
Creation date
5/23/2022 2:52:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2019 SOIL MGMT PLAN (JULY-REVISED)
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br /> <br /> <br />Soil Management Plan <br /> Former Pilkington North America Site <br />500 East Louise Avenue <br />Lathrop, California <br /> <br />Table of Contents <br /> <br />EKI B90047.00 Page i Former Pilkington North America Site <br /> Lathrop, California <br />1.0 INTRODUCTION.................................................................................................. 1 <br />1.1 Background ................................................................................................. 1 <br />1.2 Site Setting .................................................................................................. 2 <br /> Geology ........................................................................................... 2 <br /> Hydrogeology .................................................................................. 2 <br />1.3 Environmental Conditions .......................................................................... 3 <br /> Previous Environmental Investigations and Remediation .............. 3 <br /> Identified Chemicals of Concern ..................................................... 5 <br />1.4 Soil Screening Levels ................................................................................... 6 <br />1.5 Site Redevelopment Activities .................................................................... 7 <br />1.6 Applicability of this SMP ............................................................................. 7 <br />2.0 SUBSURFACE CONSTRUCTION MANAGEMENT PROTOCOLS ................................ 9 <br />2.1 Construction Impact Mitigation Measures ................................................. 9 <br /> Dust Control .................................................................................... 9 <br /> Decontamination ............................................................................ 9 <br /> Storm Water Pollution Prevention Controls ................................. 10 <br />2.2 Management of Previously Unknown Waste Pits .................................... 10 <br />2.3 Management of Visibly Stained or Odorous Soil ...................................... 12 <br />2.4 Stockpile Management ............................................................................. 13 <br />2.5 Waste Characterization ............................................................................ 14 <br /> Characterization of Soil Excavated From Waste Pits .................... 14 <br /> Characterization of Excavated Visibly Stained or Odorous Soil .... 14 <br /> Characterization of Excavated Soil with Surface Glass and Concrete <br />....................................................................................................... 15 <br /> Other Potential On-Site Reuse Soils ............................................. 15 <br />2.6 Import Fill .................................................................................................. 15 <br />2.7 Personal Protection/Safety Procedures.................................................... 16 <br />2.8 Reporting................................................................................................... 16 <br />2.9 SMP Field Coordinator/Project Manager and Contact Information ........ 16 <br />3.0 REFERENCES ..................................................................................................... 17 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.