Laserfiche WebLink
May 16, 2018 <br />Buzz Oates Development <br />Attention: Cybil Bryant <br />555 Capitol Mall, Suite 900 <br />Sacramento, CA 95814 <br />CLARIFICATION OF SURFACE DESCRIPTION IN <br /> FOUNDATION INVESTIGATION REPORT <br />MURPHY PARKWAY WAREHOUSE <br />Murphy Parkway near D’Arcy Parkway <br />Lathrop, California <br />Job No. 146-618 <br />The Surface paragraphs of the Site Conditions section of our Foundation Investigation Report (Dated <br />December 19, 2016) described the property to the north of the subject site as being occupied by the <br />“shuttered” Pilkington glass plant. This statement was intended to convey that Pilkington no longer <br />performed glass production operations on the site. The term “shuttered” was not meant to imply that <br />buildings were demolished nor that the former Pilkington buildings and property were not being put to <br />other uses. <br />Sincerely, <br />RANEY GEOTECHNICAL, INC. <br />William C. Boli <br />Geotechnical Engineer No. 2004 <br />3140 BEACON BLVD. -- WEST SACRAMENTO, CA 95691 -- TELEPHONE 916/371-0434 -- FAX 916/371-1809