Laserfiche WebLink
S 1 I O I I I Environmental Health Department <br /> C U 1 v <br /> Greorness grows <br /> Underground Storage Tank Program Inspection Report <br /> Facility Name: Date: <br /> TESORO(SPEEDWAY)68154 November 16, 2022 <br /> Facility Address: Facility Phone: Program Record: <br /> 2500 W LODI AVE, LODI, CA 95240 (209)366-0703 PR0231356 <br /> Inspection Contact: Title: Phone: <br /> -T <br /> Inspection Type: Program: <br /> COMPLIANCE REVIEW -Field Activity 2361 - UST FACILITY <br /> Overall Inspection Comments <br /> COMMENTS <br /> On site for triennial secondary containment testing. <br /> Verified sumps filled with water were filled to at least 2 inches above the highest penetration. Verified Incon sensors had <br /> been set up floating in the water in the sumps. <br /> Observed pressure gauges in place on tank annulars. <br /> Verified technician certifications. The technician did not have piping certifications available at the time of inspection. The <br /> piping on site was Environ flexible piping. Immediately submit a current certification to the EHD(ust@sjgov.org)for Tony <br /> McCarter for testing this piping. If the technician's piping certification cannot be verified,the testing of the piping will not be <br /> accepted and will need to be reconducted by a properly certified technician. <br /> Discussed test methods and the use of industry standard with the technician on site. If a manufacturer test method is not <br /> available and an industry standard is being used,the specific standard must be indicated on page 1 of the test results. Per <br /> the technician,Tony McCarter,the flexible piping is being tested at 5 PSI for 60 minutes, the same test method he uses for <br /> rigid fiberglass piping. Ensure all test methods used are appropriate for the specific component being tested. <br /> The technician was still setting up for testing and had not yet begun. Jumpers hoses were being placed on dispenser piping <br /> at the time of arrival. I confirmed that the jumpers would be removed and secondary would be opened at the sump ends and <br /> the UDC ends for all piping once testing is complete. Did not witness testing. <br /> Technician: <br /> Michael (Tony)McCarter <br /> ICC Service Technician: 9/24/23 <br /> Modern Welding: 6/21/24 <br /> Incon: 9/20/24 <br /> THIS FACILITY IS SUBJECT TO REINSPECTION AT ANY TIME AT EHD'S CURRENT HOURLY RATE. <br /> Received by: Date: November 16, 2022 Inspector: Inspector Phone: <br /> Printed Name and Title: STACY RIVERA, Lead Senior REHS (209)616-3043 <br /> Emailed to Sean Augustine, Environmental Contact <br /> FA0003815 PR0231356 SCO12 11/16/2022 <br /> EHD 23-01 Rev.01/20/22 Page 1 of 1 Underground Storage Tank Program OIR <br /> 1868 E. Hazelton Avenue I Stockton, California 95205 1 T 209 468-3420 1 F 209 464-0138 1 www.sjgov.org/EHD <br />