Laserfiche WebLink
Lab ID Client ID Collection Date <br />& Time <br />Date Logged: <br />TATMatrixTest Name Containers <br />/Composites <br />WORK ORDER SUMMARY <br />Work Order:2006C29 <br />Comments:Needs A1268 added per email <br />Client Name:ADVANCEDGEO, INC.Project:S.J Cogen <br />QC Level:LEVEL 2 <br />HoldDe- <br />chlorinated <br />SubOutBottle & Preservative <br />6/24/2020 <br />Sediment <br />Content <br />EDF EQuIS Email HardCopy ThirdPartyExcel J-flagWriteOn <br />Brian MillmanClient Contact: <br />bmillman@advancedgeo.biz; admin@advancedgeo.biz; <br />kburchard@advancedgeo.biz <br />Contact's Email: <br />WaterTrax <br />McCampbell Analytical, Inc.1534 Willow Pass Road, Pittsburg, CA 94565-1701 <br />Toll Free Telephone: (877) 252-9262 / Fax: (925) 252-9269 <br />http://www.mccampbell.com / E-mail: main@mccampbell.com"When Quality Counts" <br />2006C29-004A B51-Surface 6/23/2020 8:35 5 daysSoilSW8082 (PCBs Only) <Aroclor1016_1, <br />Aroclor1221_1, Aroclor1232_1, <br />Aroclor1242_1, Aroclor1248_1, <br />Aroclor1254_1, Aroclor1260_1, <br />Aroclor1268_1, PCBs, total_1> <br />1 4OZ GJ, Unpres <br />2006C29-005A B53-Surface 6/23/2020 9:20 5 daysSoilASTM D2216-05 (Percent Moisture)1 4OZ GJ, Unpres <br />5 daysSW8082 (PCBs Only) <Aroclor1016_1, <br />Aroclor1221_1, Aroclor1232_1, <br />Aroclor1242_1, Aroclor1248_1, <br />Aroclor1254_1, Aroclor1260_1, <br />Aroclor1268_1, PCBs, total_1> <br />2006C29-006A B53-3 6/23/2020 9:25 5 daysSoilASTM D2216-05 (Percent Moisture)1 4OZ GJ, Unpres <br />5 daysSW8082 (PCBs Only) <Aroclor1016_1, <br />Aroclor1221_1, Aroclor1232_1, <br />Aroclor1242_1, Aroclor1248_1, <br />Aroclor1254_1, Aroclor1260_1, <br />Aroclor1268_1, PCBs, total_1> <br />2006C29-007A B53-5 6/23/2020 9:25 5 daysSoilASTM D2216-05 (Percent Moisture)1 4OZ GJ, Unpres <br />5 daysSW8082 (PCBs Only) <Aroclor1016_1, <br />Aroclor1221_1, Aroclor1232_1, <br />Aroclor1242_1, Aroclor1248_1, <br />Aroclor1254_1, Aroclor1260_1, <br />Aroclor1268_1, PCBs, total_1> <br />2 of 12Page <br />- STLC and TCLP extractions require 2 days to complete; therefore, all TATs begin after the extraction is completed (i.e., One-day TAT yields results <br />in 3 days from sample submission). <br />NOTES: <br />- MAI assumes that all material present in the provided sampling container is considered part of the sample - MAI does not exclude any material from <br />the sample prior to sample preparation unless requested in writing by the client. <br />Page 56 of 73