My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2020 ADDITIONAL SITE ASSESS RPT
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
ARCHIVED REPORTS_2020 ADDITIONAL SITE ASSESS RPT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:59:43 PM
Creation date
5/24/2022 12:19:22 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2020 ADDITIONAL SITE ASSESS RPT
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
486
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Additional Site Assessment Report <br />Former SAN JOAQUIN COGENERATION <br />17200 Murphy Parkway, Lathrop, San Joaquin County, California <br />(APN 198-120-05) <br /> <br /> <br />1.0. INTRODUCTION <br /> <br />At the request of Heorot Power Holdings LLC (“HPH”), AdvancedGeo, Inc. (AGI) has <br />prepared this Additional Site Assessment Report for the property located at <br />17200 Murphy Parkway, Lathrop, California (herein referred to as site or subject <br />property). <br /> <br />The scope of work included the advancement of thirty-six (36) soil borings to assess and <br />delineate soil impacted with polychlorinated biphenyls (PCBs) and total petroleum <br />hydrocarbons (TPH), and to define the limits of the South Waste Cell. The site and <br />surrounding area are illustrated in Figure 1. A site plan depicting site features, boring and <br />well locations, former waste cells east of the site and existing waste cells identified onsite <br />is presented in Figure 2. Site plans depicting the east property boundary area and former <br />power plant area are presented in Figures 3 and 4, respectively. <br /> <br /> <br />2.0. BACKGROUND <br /> <br />The scope of work and field procedures for the investigation were presented in the <br />following AGI-prepared documents: 1) Revised Additional Site Assessment Work Plan, <br />dated 17 December 2019; approved by Central Valley Regional Water Quality Control <br />Board (Regional Board) letter dated 10 March 2020; 2) Work Plan Addendum, dated <br />24 February 2020; approved by Regional Board letter dated 06 March 2020; and 3) <br />Revised Work Plan Addendum, dated 17 March 2020; approved by Regional Board email <br />dated 19 March 2020. The Regional Board approval letters and email are provided in <br />Appendix A. <br /> <br />A drilling permit was procured from the San Joaquin County Environmental Health <br />Department (EHD) prior to field activities. A Copy of the approved EHD drilling permit is <br />provided in Appendix B. <br /> <br />Site background and historical information was provided in the Site Historical Activity <br />Report, Amended August 2018; Initial Site Investigation Work Plan – Final dated <br />31 August 2018; and Revised Site Assessment Report dated 03 September 2019. <br /> <br /> <br />3.0. SOIL PROBE BORING ADVANCEMENT <br /> <br />A total of thirty-six (36) soil borings (B44 through B79) were advanced at the site between <br />22 and 25 June 2020. Initially, thirty (30) soil borings were proposed to assess soil impact <br />and define the South Waste Cell area. During the investigation, three (3) additional
The URL can be used to link to this page
Your browser does not support the video tag.