Laserfiche WebLink
5 <br /> <br />Brad Taylor, P.E. <br />Associate Engineer <br />City of Lathrop | Public Works Department <br />390 Towne Centre Drive, Lathrop, CA 95330 <br />P: (209) 941-7438 | C: (209) 992-0970 <br /> <br />From: Gregory Gibson <ggibson@ci.lathrop.ca.us> <br />Sent: Tuesday, January 26, 2021 2:26 PM <br />To: Ken Reed <kreed@ci.lathrop.ca.us> <br />Cc: Brad Taylor <btaylor@ci.lathrop.ca.us> <br />Subject: RE: Emailing: [1] C6.0 MURPHY PARKWAY - PLAN AND PROFILE <br /> <br />Ken, <br /> <br />Please confirm if the monitoring well location matches what is shown on the attached photo (the yellow dot near the ‘y’ <br />on ‘Murphy Pkwy’ in front of the former CoGen site. I have a contact with San Joaquin County Environmental Health <br />Dept., but I want to make sure we are looking at the correct well location. <br /> <br />Thanks, <br />Greg <br /> <br />