My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_2021 SITE INVESTIGATION WORK PLAN
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
500
>
4400 - Solid Waste Program
>
PR0504201
>
ARCHIVED REPORTS_2021 SITE INVESTIGATION WORK PLAN
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/19/2024 2:59:30 PM
Creation date
5/24/2022 1:17:54 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
4400 - Solid Waste Program
File Section
ARCHIVED REPORTS
FileName_PostFix
2021 SITE INVESTIGATION WORK PLAN
RECORD_ID
PR0504201
PE
4430
FACILITY_ID
FA0000214
FACILITY_NAME
PILKINGTON NORTH AMERICA INC PLANT 10
STREET_NUMBER
500
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330-9739
CURRENT_STATUS
01
SITE_LOCATION
500 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\cfield
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Site Investigation Work Plan <br />Former SAN JOAQUIN COGENERATION <br />17200 Murphy Parkway, Lathrop, San Joaquin County, California <br />(APN 198-120-05) <br /> <br />TABLE OF CONTENTS <br /> <br /> <br />SECTION PAGE <br /> <br />1.0. INTRODUCTION ................................................................................................... 1 <br />2.0. SITE DESCRIPTION AND BACKGROUND ......................................................... 1 <br />2.1. SITE LOCATION AND DESCRIPTION .............................................................. 1 <br />2.2. SITE BACKGROUND ........................................................................................ 2 <br />2.3. SITE USE ........................................................................................................... 2 <br />2.4. CURRENT SITE ENVIRONMENTAL CONDITIONS ......................................... 2 <br />2.5. STRATIGRAPHY AND GROUNDWATER ......................................................... 3 <br />3.0. SCOPE OF WORK................................................................................................ 4 <br />3.1. PRE-FIELD WORK ACTIVITIES ........................................................................ 5 <br />3.2. EQUIPMENT DECONTAMINATION/WASTE MANAGEMENT .......................... 5 <br />3.3. REPORT PREPARATION .................................................................................. 5 <br />4.0. FIELD PROCEDURES .......................................................................................... 5 <br />4.1. SURFACE SAMPLE COLLECTION AND ANALYSIS ........................................ 5 <br />4.2. TRENCHING AND SOIL SAMPLE COLLECTION AND ANALYSIS .................. 6 <br />4.3. SOIL BORING ADVANCEMENT ....................................................................... 7 <br />4.3.1. Soil Sampling ............................................................................................... 7 <br />4.3.2. Groundwater Sampling ................................................................................ 8 <br />4.3.3. Boring Abandonment ................................................................................... 8 <br />4.4. CONCRETE SAMPLE COLLECTION ................................................................ 8 <br />4.5. ANALYTICAL REPORTING PROCEDURES ..................................................... 9 <br />5.0. LIMITATIONS ....................................................................................................... 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.