Laserfiche WebLink
5.2 Description of soil profile pit including depth and dimensions. Two shallow test holes <br />and two deep percolation tests holes were prepared per County Standards, though only two were <br />evaluated by EHD. Please see Appendix for plate. The shallow test hole was excavated to a <br />depth of 36 inches. The hole was backfilled with 2 inches of "pea gravel". <br />5.3 Description of soil lithology as noted from test pit by appropriate professional using <br />industry standard protocol. The Soil in this area is classified as San Joaquin Loam, thick <br />surface 0-2 % slopes as stated in the Soil Survey of San Joaquin County, as provided by the <br />United States Department of Agriculture, Soil Conservation Service. <br />5.4 Discussion of soil lithology as related to future onsite septic uses: The San <br />Joaquin Loam has a low permeability rate. <br />6.0 PERCOLATION TEST INFORMATION SECTION <br />6.1 Site map showing the location, with concise and accurate dimensions of the percolation <br />test holes on the parcel: See Appendix. <br />6.2 The minimum number of shallow and deep percolation tests were performed for each <br />parcel: Two shallow percolation test hole and two deep percolation test were prepared on subject <br />Parcel. Only one shallow and one deep test were evaluated by county staff. <br />6.3 Description of the date, time and protocol used to prepare the test hole, including <br />depth and dimensions of hole, preparation of hole, and depth of water used to presoak <br />(minimum 12 inches): The shallow test hole was excavated to a depth of 36 inches and backfilled <br />with 2 inches of "pea gravel" in accordance with County Standards. The shallow hole was prepared <br />by Neil O. Anderson Staff, on April 15, 2004 at 7:30 a.m. On April 19, 2004 at 7:30 a.m., the 24 <br />hour presoak period was started. The hole was filled with 12 inches of water over the gravel at <br />this time. <br />6.4 Description of the date, time and condition of the test hole after the 24-hour soak period <br />(hole still intact, hole dry, preparation of hole, and depth of water used to presoak (minimum <br />12 inches): A percolation test was conducted for the borings on April 20th, 2004 in accordance <br />with the requirements of the EHD. A percolation test with duration of 4 hours was performed. <br />The last half hour of the 4 -hour percolation test was observed by Lisa Medina, Environmental <br />Health Inspector, EHD. <br />6.5 The test conformed to SJC Policy EH 02-02 (correct depth, diameter, 2" gravel, 6" water <br />refill, correct readings recorded). The percolation tests conformed to San Joaquin County Policy <br />EHD 02-02. Measurement of the water level during the percolation test was from a fixed <br />referenced point on the PVC casing using an electric well sounder with a depth capacity of 1/100th <br />foot. All tabulated values on the field data sheet (appendix) are in decimal feet. After water drop <br />was observed, the holes were checked for refill. The refill level was approximately 0.5 ft (6 inches) <br />of water above the bottom level of the percolation test hole. The readings were taken <br />approximately every 30 minutes for a period of 4 hours. <br />