Laserfiche WebLink
I <br /> CAUTION: <br /> POTENTIAL UTILITY CONFLICT. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CANOPY NOTE' <br /> > ITE x � °. AND NEW UTILITIES PRIOR TO CONSTRUCTION. SEE UTILITY CONFLICT NOTE PRIOR TO FINAL INSPECTION, G.C. SHALL PROVIDE A VIDEO OF THE <br /> �� �'` THE EXISTING WATER, STORM, AND SANITARY SEWER SERVICE SHOWN IS TOP OF THE CANOPY STRUCTURE, CONFIRMING THAT IT IS CLEAN AND <br /> m IN PROPER ORDER. THE VIDEO SHOULD SHOW THE FULL LENGTH OF <br /> m ��� APPROXIMATE, BASED ON FIELD SURVEYS AND "AS-BUILT" RECORDS. THE <br /> `�' o / THE CANOPY PROVIDING PROOF THAT NO DEBRIS IS PRESENT AND 00 <br /> — <br /> D ;G y �; ,\� GENERAL CONTRACTOR SHALL POTHOLE THE EXISTING UTILITIES TO VERIFY u_ L0 <br /> THE DIAMETER AND LOCATION (INCL. ELEVATIONS) PRIOR TO CONSTRUCTION. THAT THE DRAINS ARE CLEAR. 0 0 <br /> GRANT LINE RD c® � �� "�� ANY DISCREPANCIES IN THE LOCATION OF THE EXISTING PIPE OR <br /> a'� . COMPLIANCE NOTES ~ Q <br /> INCOMPATIBILITY OF THE DESIGN SHALL BE BROUGHT TO THE IMMEDIATE <br /> Lu <br /> PROJECT LOCATION ���,•� ATTENTION OF THE OWNERS REPRESENTATIVE. Q <br /> 205 Pa \q`� <br /> W. 11TH ST T T ACY ��" UTILITY CONFLICT NOTE COMPLIANCE NOTES ARE LOCATED ON SHEET T6-1. o 0� J <br /> - <br /> GGGG CAUTIONS > z W <br /> IN Q COc� <br /> THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, z _j Z � u_ <br /> o I /j I DIMENSION, AND DEPTH OF ALL EXISTING UTILITIES WHETHER SHOWN ON THESE o Q J 0 <br /> //� PLANS OR NOT BY POT HOLING THE UTILITIES AND SURVEYING THE ¢ Q W Q W <br /> Q ~G��� ° ,�%� HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL H Z U Z <br /> Of ^ �`�� j�%/ INCLUDE CALLING UTILITY LOCATE @ 1 (800) 642-2444 AND THEN POT HOLING N ][ (n J <br /> NOT TO SCALE ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY CROSSINGS TO w Q 0 <br /> \� NOT TO SCALE PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID 0- - Z <br /> UTILITIES AS SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED C) <br /> PUBLIC INFORMATION AND ARE SUBJECT TO VARIATION. IF CONFLICTS SHOULD o `� o CL <br /> Q � Q Q <br /> VICINITY MAP LOCATOR MAP RESOLVE THE ALLCONTRACTOR PROBLEMSS PRIORL CONSULT THE TO PROCEEDING WITHECONS CONSTRUCTION.ON. TO � = Of Z <br /> 0- U a_ O H 0 <br /> CD CD CD 1= O O <br /> SHEET INFORMATION NOTE: V) cn N 0. N U <br /> BASE SHEET INFORMATION PROVIDED BY BARGHAUSEN CONSULTING ENGINEERS, INC., <br /> FILE NAME zl0050s.dwg, DATED 05.13.2021 . BARGHAUSEN CONSULTING ENGINEERS ;Y 3 4 14 FILL, STAGE I (TYP. '\; ,\ 0 0 0 Q 0 <br /> ARE NOT RESPONSIBLE FOR THE HORIZONTAL CONTROL. SEE CIVIL AND CONTRACTOR TO REMOVE.,E STING TANK ANNULAR SENSOR AND 1A 17 18 OF TANKS 1-3 <br /> ��^' i ) U <br /> ARCHITECTURAL SHEETS. REPLACE WITH NEW. C NTRACTOR TO REMOVE EXISTING 18" TANK 11 i i m m m m <br /> FIRST FUEL DROP REQUIREMENT ANNULAR MANW ID AND REPLACE WITH NEW 24" LID. TYP. OF 1 EXISTING PREMIUM TANK #3 20K ;;==' GENERAL NOTES <br /> TANKS #1-3) GAL. TO REMAIN AND BE � <br /> CONVERTED TO UNLEADED TANK PIPING LEGEND N N 0 <br /> PRIOR TO FUEL DROP, THE G.C. SHALL HAVE THE VEEDER ROOT MONITORING SYSTEM / ;\ %;; EXISTING UNDERGROUND UTILITIES N <br /> CONTRACTOR TO REMOVE EXISTING FILL SUMP 1A G (WATER, GAS, TELEPHONE , SEWER) o +� <br /> OPERATIONAL. OWNER WILL NOT SCHEDULE FUEL FOR DELIVERY UNTIL THE i 15 N1`W 4" OVER 3" DW FRP PROIDt_�� ACTIVE SIPHON BETWEEN­ <br /> JURISDICTION HAS AUTHORIZED THE SITE FOR FIRST FUEL DROP, VEEDER ROOT IS FILL/SPILL EQUIPMENT AND REPLACE WITH-NEW. 1 TANKS 2 & 3. " "-' - - - - - - 3" OVER 2" DOUBLE WALL FIBERGLASS PRODUCT PIPING (N.O.V. RED THREAD) rn oo o <br /> i =-'',� -'' z <br /> OPERATIONAL AND MONITORING THE TANKS/LINES AND THE SITE IS ACCESSIBLE FOR / (TYP. OF SNS #1-3) <br /> -;=-' - - - - - - - - - - - - - 3" OVER 2" DOUBLE WALL FIBERGLASS VENT PIPING (N.O.V. RED THREAD) <br /> FUEL TRUCKS. IN ADDITION, G.C. SHALL PROVIDE A VIDEO OF THE LISTS, PRIOR TO i <br /> THE FIRST FUEL DROP, CONFIRMING THE TANKS ARE COMPLETELY DRY. THE VIDEO NEW 3" INSIDE 4� FIBERGLASS DOUBLE \\ / 4" OVER 3" OR 3" OVER 2" DOUBLE WALL FIBERGLASS VAPOR RECOVERY PIPING (N.O.V. RED THREAD) <br /> SHOULD SHOW THE FULL LENGTH OF THE TANKS PROVIDING PROOF THAT THE TANKS / WALE VAPOR RECOVER <br /> PIF <br /> 18 / O <br /> i -;;,; # INDICATES DISPENSER NUMBERING AND POSITION <br /> ARE DRY. <br /> CONTRACTOR TO REMOVE-EXISTING MANWAY 1A <br /> LID AND REPLACE WITH NEW COMPOSITE LID " NOTE: <br /> (TYP. OF TANKS -3) 15 W 4" OVER 3" DW FRP PRODUCT ACTIVE SIPHON BE N CONTRACTOR ASSUMES RESPONSIBILITY TO ASSURE THAT THE OPERABLE SYSTEM MEETS THE DESIGN INTENT AND THE CONTRACTOR IS PERMITTED TO <br /> 8 KS 1 & 2. \\ ADJUST SIZES AND CUTS BASED ON ACTUAL FIELD CONDITIONS AND INSTALLATION TECHNIQUES. <br /> CONTRACTOR TO REMOVE EXISTING TURBINE i ( \ 7 3" OVER " FRP ADDITIVE PRODUCT PI G * PRODUCT, VAPOR AND VENT PIPING IS TO SLOPE TOWARD TANK 1/8" PER FOOT MINIMUM, 1/4" PER FOOT PREFERRED. SIPHON AND VENT STACK PIPING TO <br /> SUMP TOP HAT ANP- REPLACE WITH NEW (TYP. ,, G \� / SLOPE 1/8" PE FT. BACK TO ADDITIVE TANK SLOPE 1/4" PER FOOT. <br /> OF TAN 1-3) �� ��� Q * SECONDARY CONTAINMENT PIPING IS SHOWN BY NOTE ONLY, NOT GRAPHICALLY. ALL PRODUCT, VENT AND VAPOR RECOVERY PIPING TO BE DOUBLE <br /> / NEW D UBLE WALL FIBERGLASS PIPING TRANSITI SU <br /> \ CONTAINMENT FIBERGLASS PIPE. FOR QUESTIONS REGARDING FGS BONDER CERTIFICATION AND/OR AB-2481 PIPING METHODS AND STANDARDS, PLEASE <br /> CON RAPTOR TO REMOVE EXI G SUMP ND 1A > WITH TM ADDITIVE INJECTION SYSTEM ON 0 RACK <br /> i REPLACE WITH NEW " DIA. DO E WALL, '' <br /> 9 CONTACT SCOTT WILSON AT (425) 483-3530. <br /> / FIBERGLASS SU (TYP. ANKS #1�3) — * IT IS THE INTENT OF THIS DESIGN TO PROVIDE A TANK & PIPING SYSTEM COMPLIANT WITH AB-2481 REQUIREMENTS FOR CONTINUOUS MONITORING OF ALL <br /> i \ 21 NEW A ID PERMEATOR. ON CONC TE PAD INSIDE TANK & PIPING SYSTEM COMPONENTS. ALL DOUBLE WALL PRODUCT, VENT AND VAPOR PIPING SHALL BE MONITORED VIA CONTINUOUS VACUUM MONITORING. <br /> CONTRACTOR TO REMOVE EXISTING--2 HP TURBINE PUMP H PLLD D REPLACE WITH TWO 5 \ T6— CMU WA L ENCLOSURE ALL TANK TURBINE SUMPS, FILL SUMPS AND DISPENSER SUMPS SHALL BE MONITORED BY CONTINUOUS HYDROSTATIC SENSORS. ALL TANKS ANNULAR SPACES <br /> (2) NEW FE PETRO 2 HP VARIABLE SPEED TUR PUMPS TH NEW PLOD ON PRIMARY �� �� SHALL BE MONITORED BY CONTINUOUS HYDROSTATIC SENSORS. ALL MONITORING DEVICES & SYSTEMS SHALL BE CERTIFIED FOR USE IN CA UNDER LG-113 <br /> PUMP AND NEW NON-VENTED CHECK VALVE 0 ECONDA PUMP. BTW TURBINES ARE TO '/ \ NEW 3" OVE 2" TANK VENT FRP SLOPE 1/4" P AND THE NATIONAL LEAK DETECTION WORKGROUP. <br /> BE MANIFOLDED T0.GETHER WITHIN THE TU E SUMP. ONTRACTOR TO RELOCATE EXISTING i \ 18 FT. BACK TO ANKS 1-3 & 5 _ <br /> ATG TO�CE'I�1TER BUNG TO INST SECOND TURBINE-PUMP. (TYP. OF TANKS #1-3) \ \ B FIVE (5) NEW 2' BLACK STEEL VENTRISEW <br /> T6-1 PAINTSIN N WDVE NT RISERS TOLE WALL NMAITC ENT UMP <br /> I TING TANK AND PIPING INSTALLATION NOTES J (v <br /> o \ \ \ Q ���/ LANDSCAPING. O THREE (3) EXISTING 20,000 GALLON AND ONE (1) 1,500 GALLON "CONTAINMENT SOLUTIONS" DOUBLE WALL FIBERGLASS TANKS TO REMAIN. W 0 <br /> EXISTING TANK #4 GAS E ITIVE W <br /> i q \ �� o `,\ ���'� 1,500 GAL. TO REM CONTRACTOR TO CONVERT EXISTING TANK #3 UNLEADED PREMIUM GRADE (91 OCTANE) TO UNLEADED REGULAR GRADE (87 OCTANE) TANK #3 TO BE PUMPED <br /> 2 T3-1 \\\ \ \\\ \ �7 CON RACTOR TO INTERCEPT EXISTING PRODUCT AND TRIPLE RINSED CLEAN USING A VACUUM TRUCK AND HIGH PRESSURE, LOW VOLUME PRESSURE WASHER PRIOR TO INITIAL NEW FUEL DROP. O Q Q <br /> PIPIN AND INSTALL NEW 3" OVER 2" TANK 1A CONTRACTOR TO REMOVE EXISTING FILL SUMP FILL/SPILL LID ASSEMBLY AND REPLACE WITH NEW MULTIPORT ASSEMBLY. CONTARCTOR TO REMOVE EXISTING = W <br /> \ / PROD T FRP SLOPE 1/8" PER FT. BACK T K TURBINE SUMP LID ASSEMBLY AND REPLACE WITH COMPOSITE MANWAY LID ASSEMBLY, CONTRACTOR TO REMOVE EXISTING TURBINE SINGLE WALL FIBERGLASS <br /> o �� #4. CO TRACTOR TO FIELD VERIFY E T ATION. TURBINE CONTAINMENT SUMP AND REPLACE WITH NEW 48" DOUBLE WALL FIBERGLASS TURBINE CONTAINMENT SUMP. CONTRACTOR TO REMOVE EXISTING TURBINE Q = <br /> 1� \�� \ O \ j�� 9 CON RACTOR TO INTERCEPT E= VENT SUMP TOP HAT AND REPLACE WITH NEW. (TYP. OF TANKS #1-3) O J Q <br /> i EXISTING \ i o 18 PIPIN AND INSTALL NEW 3" OVER 2" TANK U D <br /> TANK #2 �\ VENT RP SLOPE 1/4" PER FT. BACK TO TANK CONTRACTOR TO INSTALL A NEW 7" MIN. REINFORCED CONCRETE SLAB OVER TANKS. SURFACE WATER SHALL BE DIVERTED AWAY FROM EACH MANHOLE BY � 0 <br /> i UNLEADED \ \ �� 4. CO TRACTOR TO FIELD VERIFY EXACT FORMING A CONCRETE CROWN WITH A 2" DROP IN 18" FROM THE EDGE OF THE MANHOLE RING TO THE SURROUNDING SLAB ELEVATION. TANK SLAB SHALL BE <br /> i 20K GAL. �\ / LOCATIO . THICKENED AT TANK SUMPS TO BE JUST BELOW TOP OF TANK SUMP'S SECONDARY CONTAINMENT TERMINATION PER AB-2481 REQUIREMENTS. CONSTRUCT SLAB (f� <br /> i TO REMAIN \ /,''' <br /> G PER CIVIL SLAB INSTALLATION DETAILS AND SPECIAL REQUIREMENTS SHOWN ON DETAILS ON DRAWINGS T4-1 AND T5-1 0 <br /> o � <br /> N OVERFILL ALARM AND �3 0 ca <br /> CONTRACTOR TO REMOVE AND REPLACE WITH THREE (3) NEW 4" EVR PHASE I APPROVED DUAL POINT FILL ADAPTERS AND CAPS AT TANKS 1-3. <br /> vk AC NOWLEDGE SWITCH INSTALL FILL DROP TUBE WITH OVERFILL PREVENTION. <br /> O \ \ \ �O ® CONTRACTOR TO REMOVE AND REPLACE WITH THREE (3) NEW 3" EVR PHASE I APPROVED DUAL POINT STAGE I VAPOR RECOVERY ADAPTERS <br /> / EXISTING \\ ��;/� • <br /> PROPOSED TRANSFORMER C AND CAPS A TANKS 1-3. <br /> TANK #1 \ 0 <br /> � 0 UNLEADED ` \� � \ \ LOCATION <br /> \ �� \ \ • O CONTRACTOR TO REMOVE EXISTING 2 HP TURBINE PUMP WITH PLLD AND REPLACE WITH TWO (2) NEW FE PETRO 2 HP VARIABLE SPEED TURBINE PUMPS WITH NEW <br /> / 20K GAL. / ®/� PLLD ON PRIMARY PUMP AND NEW NON-VENTED CHECK VALVE ON SECONDARY PUMP. BOTH TURBINES ARE TO BE MANIFOLDED TOGETHER WITHIN THE TURBINE L <br /> TO REMAIN/ %� �j\\N k ` \\ SUMP. CONTRACTOR TO RELOCATE EXISTING ATG TO CENTER BUNG TO INSTALL SECONDARY TURBINE PUMP. (TYP. OF TANKS #1-3) 0 <br /> LL <br /> 2 \ \ NEWO3"DOVER NFkW SET EACH NEW TURBINE INTAKE FOR GASOLINE TANKS AT 6" FROM BOTTOM, 3" FOR ADDITIVE TANK. INSTALL TURBINE INTAKE FILTER SCREENS ON EACH TURBINE. <br /> 2 FRP ONTROLLER IDENTIFY WITH A BRASS LABEL THE DISPENSERS SERVED BY EACH PRODUCT PIPE WHERE IT PENETRATES THE TURBINE SUMP. CONTRACTOR TO LABEL TURBINES <br /> PRODUCT NCLOSURE AND CONTROLLERS AS TO WHICH SIDE OF THE STATION THEY SERVE. GREEN CONTROLLER LIGHTS ARE TO GO OUT WHEN TURBINES ARE OFF OR LOSE POWER. <br /> NEW 3" OVER 2" \ \ �PIPING(TYP.) TURBINES TO BE EQUIPPED WITH .1 GPH PRESSURE LINE LEAK DETECTION AND PLLD DETECTORS ARE TO BE TESTED FOR THE .1 GPH LEAK DETECTION PRIOR TO <br /> FRP PRODUCT ` \ \ START UP. CONTRACTOR TO PROVIDE LEAK DETECTION TEST DATA AT THE TIME OF PUNCH LIST INSPECTION AND SHALL BE INCLUDED IN CLOSE OUT BINDER. <br /> PIPING (TYP.) O \\ <br /> © CONTRACTOR TO INSTALL NEW 4" OVER 3" DOUBLE WALL FIBERGLASS (N.O.V. RED THREAD) STAGE II VAPOR RECOVERY HEADER FOR HEALY VAC ASSISTED VAPOR <br /> \\\ 7 18 ��! \ RECOVERY SYSTEM. SLOPE 1/8" PER FOOT MINIMUM TO TANKS. CONTRACTOR TO INSTALL NEW 3" OVER 2" REDUCING TEES WHERE HEADERS BRANCH TO <br /> ' NEW TANK #5 / ,�/ ' / / 8 \\` NEW 3" OVER 2" ` NEW 4' OVER \, DISPENSERS. CONTRACTOR TO INSTALL COMPONENTS FOR HELIUM GAS (CGRS) TESTING WITH VAPOR PIPING. TESTING OF VAPOR LINES SHALL BE PERFORMED PRIOR <br /> / PREMIUM /�' ( / / \\ FRP PRODUCT 3 FRP VAPOR TO BACKFILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. SUMP PENETRATION SHALL BE ON LONG SIDE OF DISPENSER SUMP. VAPOR LINES INTERSTITIAL <br /> 40K GAL. /��/ \ PIPING (TYP.�,�'� \ PIPING (TYP.) \ SPACE SHALL BE CONTINUOUSLY VACUUM MONITORED PER LG-162 REQUIREMENTS. <br /> \ \ �,; �`;\ INSTALL TWO (R NEW VEEDER ROOT 7 CONTRACTOR TO INSTALL THREE 3 NEW 3" OVER 2" DOUBLE WALL FIBERGLASS N.O.V. RED THREAD GASOLINE SUPPLY LINES FROM TANKS 1-3 TO DISPENSERS. <br /> \\\ \ p� �� TLS-350R ALARM MONITOR SYSTEMS O O ( ) <br /> NEW_ 4 OVER 3 kp 3 \\ 0 \`\ NEW EMERGE P MP CONTRACTOR TO INSTALL THREE (3) NEW 3" OVER 2" DOUBLE WALL FIBERGLASS (NOV) ADDITIVE SUPPLY LINE FROM NEW VENT SUMP TO EXISTING GASOLINE TANK <br /> 13 \ 7 18 <br /> _____FRP VAPOR 2 • O \\ SHUTOFF IT PER CFC 1-3 FILL SUMPS. <br /> ��O C '' �/ 14 \\ NEW 3" OVER 2" \1� ,- ' ' PIPING (TYP.) O4 \ ', \`\ RE E S <br /> 6 18 \\ ` FRP PRODUCT \ 6 18 \ CONTRACTOR TO INSTALL ONE (1) NEW 3" OVER 2" DOUBLE WALL FIBERGLASS (NOV) ADDITIVE SUPPLY LINE FROM INTERCEPTION POINT OF EXISTING PIPE <br /> \ \ NEW 4" OVER3" PIPING (TYP.) \ cp' \ (CONTRACTOR TO FIELD VERIFY EXACT LOCATION) TO NEW VENT SUMP FOR TANK #4. QRpFESS/0 <br /> FRP VAPOR ,�'� --� F` \ NEW 3" OVER •�� \`" <br /> ® ` PIPING (TPP.) \` i'� \ \ 2" FRP VAPOR NEW PIPING SHALL BE INSTALLED PER MANUFACTURER'S SPECIFICATIONS AND INSTRUCTIONS. PIPING SHALL BE INSTALLED WITH A SLOPE OF 1/8" PER FOOT =��' '1'c <br /> \\ O \\ \\ ",\ \ \\` ��'�\` \ MINIMUM FROM THE FURTHEST DISPENSER SUMP DOWN TO THE TURBINE SUMPS. CONTRACTOR TO INSTALL TRACER WIRE WITH PRODUCT PIPING. TESTING OF HAL P. GRUBB <br /> NEWV 4 OVER 3 PIPING (TYP.) ;;= \ PRODUCT LINES SHALL BE PERFORMED PRIOR TO BACKFILL, PRIOR TO PAVING AND BEFORE STATION OPERATION. PRODUCT LINES INTERSTITIAL SPACE SHALL BE <br /> kri <br /> � \ \ ,-FRP VAPOR `L'`p `O \ • 5 \ \ �''�� \\ CONTINUOUSLY VACUUM MONITORED PER LG-162 REQUIREMENTS. -� 67814 <br /> ` ? -;-'' <br /> ` 2® 19 \\`\ 7„ 18 \\ \ PIPING (TYP.) 10 \ 6 18 <br /> 20 NEW 3 OVER 2 �� ' \ NEW 3" OVER 2" Al ; \' �/ \ \/ ® CONTRACTOR TO REMOVE EXISTING VEDDER ROOT TANK AND LINE ALARM CONTROL PANEL AND INSTALL TWO (2) NEW "VEEDER ROOT" TANK AND LINE ALARM <br /> \ \ FRP PRODUCT �,, 6 18 \\ FRP VAPOR s \�� CONTROL PANELS MODEL # TLS-350R IN EQUIPMENT ENCLOSURE BUILDING. SEE ELECTRICAL DRAWINGS FOR EXACT LOCATION. Q <br /> ` \�\ PIPING (TYP.) \�, \` PIPING (TYP.) 28 �✓% `l�q �� <br /> \ \ Og CONTRACTOR TO INSTALL THREE (3) NEW 3" OVER 2" DOUBLE WALL FIBERGLASS (N.O.V. RED THREAD) VENT LINES FOR TANKS 1-3. SLOPE 1/4" PER FOOT (1/8" TF V �FO� <br /> EXISTING FIRE ,moi' „ „ F CAS- <br /> �� »� -� \ �' ,-, \ � EXTINGUISHER PER FOOT MINIMUM) TO TANKS AS SHOWN. CONTRACTOR TO INSTALL ONE (1) NEW 3 OVER 2 DOUBLE WALL FIBERGLASS (NOV) ADDITIVE VENT LINE FROM 05/27/22 • <br /> O \ NEW 4 'OVER 3 \ ------------------- <br /> INTERCEPTION POINT OF EXISTING PIPE (CONTRACTOR TO FIELD VERIFY EXACT LOCATION) TO NEW VENT SUMP FOR TANK #4. SLOPE 1/4" PER FOOT (1/8" PER a <br /> ` \ kp ` 11 \ CLASS 4A: 60BC;�� � ' � �' ---------` <br /> \ FRP VAPOR 2 15 \ FOOT MINIMUM) TO ADDITIVE TANK AS SHOWN. CONTRACTOR TO INSTALL TRACER WIRE WITH ALL VENT PIPING. VENT LINES INTERSTITIAL SPACE SHALL BE X <br /> \\ PIPING (TYP.) 16 ` 6 18 12 p (TYP. OF <br /> NEW 3" OVER 2" k CONTINUOUSLY VACUUM MONITORED PER LG-162 REQUIREMENTS. a U a <br /> i <br /> \ 6 18 \ FRP VAPOR " <br /> CONTRACTOR TO INSTALL NEW VENT RISERS AND DOUBLE WALL FIBERGLASS VENT SUMP. TERMINATION POINT OF NEW TANK VENT RISERS TO BE A MINIMUM OF 12 cn 0 z > z m <br /> ` \\` PIPING (TYP.) -' ��' 16 CONTRACTOR TO REINSTALL SIX (6) EXISTING ABOVE GRADE AND NOT WITHIN 5' FROM ANY BUILDING OPENING OR PROPERTY LINE THAT CAN BE BUILT UPON. VENT RISERS SHALL BE INSTALLED IN = <br /> GILBARCO ENCORE 700S SINGLE HOSE PER SIDE, ACCORDANCE WITH CALIFORNIA FIRE CODE REQUIREMENTS. INSTALL THREE (3) 1" CONDUITS FROM VENT RISER TO CONTROLLER ENCLOSURE. INSTALL DOUBLE WALL <br /> ` \ 2+0 PRODUCT MPD WITH EXISTING HANGING VENT TRANSITION SUMP WITH SENSORS. <br /> HARDWARE ON NEW DOUBLE WALL FIBERGLASS > > N N Q0 <br /> ` 2k 00 <br /> 21 \ •� \17 \ UNDERGROUND CONTAINMENT DISPENSER SUMP. 11 CONTRACTOR TO REPLACE EXISTING TANK ANNULAR SENSOR. (TYP. OF TANKS 1-3) m N <br /> �' CONTRACTOR TO PATCH BACK ISLAND WITH A PARTIAL <br /> p o <br /> k = FORM <br /> \\ ��%' �� '' DISPEISLANDNSERS) AS REQUIRED. (TYP. OF ALL EXISTING 0 o <br /> ` 12 NOT USED 3 � 0 �, f) <br /> ` \\ ` \�"> /��i moi' moi' 0 CL <br /> 0 0 Q 0 <br /> 0 • • O \ / ' 13 CONTRACTOR TO REMOVE EXISTING AND INSTALL NEW .1 GPH MAG PROBE TANK LEVEL GAUGES AT LOCATIONS SHOWN ON TANKS 1-3. Q <br /> II / 14 CONTRACTOR SHALL PROPERLY MARK AND TAG EXISTING TANK #1-3 WITH STANDARD API IDENTIFICATION MARKING AND BRASS TAG AT FILL MANHOLE. <br /> n** �''� 15 CONTRACTOR TO INSTALL NEW 4" OVER 3" DOUBLE WALL FIBERGLASS N.O.V. RED THREAD ACTIVE SIPHON BETWEEN 87 OCTANE TANKS AS SHOWN. V N <br /> � =' O TOP OF SIPHON PIPING SHALL BE INSTALLED LEVEL AND NO HIGHER THAN 145" FROM BOTTOM OF TANK ON BOTH TANKS. O o <br /> O2 , 0 <br /> 16 CONTRACTOR TO REINSTALL SIX (6) EXISTING GILBARCO ENCORE 700S SINGLE HOSE PER SIDE, 2+0 PRODUCT MPD WITH EXISTING HANGING HARDWARE ON NEW i � <br /> DOUBLE WALL FIBERGLASS UNDERGROUND CONTAINMENT DISPENSER SUMP. CONTRACTOR TO PATCH BACK ISLAND WITH A PARTIAL ISLAND FORM AS REQUIRED. (TYP. <br /> OF ALL EXISTING DISPENSERS) -J _ <br /> �' 1'\X��✓� ,-; \\ / NEW DISPENSER SUMPS SHALL BE DOUBLE WALL TO AT LEAST THE BOTTOM OF CONCRETE DRIVE SLAB AND HYDROSTATICALLY MONITORED PER LG-162-1 �O I o <br /> " COMPLIANCE OPTION. ALL CONDUITS ENTERING THE DISPENSER SUMPS SHALL BE PVC COATED RIGID. SEE SHEET T7-1 FOR TYPICAL INSTALLATION DETAILS. START am <br /> m <br /> UP BY OWNER'S REPRESENTATIVE. GENERAL CONTRACTOR TO PURGE LINES THROUGH EACH HOSE/NOZZLE. START PURGE OPERATION THROUGH SHEAR VALVE WITH N <br /> FUEL POSITION NUMBERING' 500 GALLON PURGE, AND THEN CONTINUE THROUGH EACH METER/NOZZLE WITH 50 GALLON PURGE. ANY AIR POCKETS OR START UP PROBLEMS DUE TO W � o <br /> IMPROPER INSTALLATION OR INCORRECT WIRING THAT DESTROYS ELECTRONICS WILL BE BILLED BACK TO THE CONTRACTOR. AFTER PURGING THE PRODUCT LINES N M <br /> II OF AIR AND BEFORE THE A TESTING, CONTRACTOR IS TO REPLACE THE FACTORY INSTALLED GASOLINE FILTERS WITH THE OWNER SUPPLIED FILTERS. ALL > 000 N o <br /> NOTE: FUELING POSITIONS AT THE DISPENSERS ARE NUMBERED AS CONDUIT ROUTED TO DISPENSERS SHALL BE PVC COATED RIGID. <br /> Ln <br /> FOLLOWS: =' Q N o <br /> \ 17 NEW FILL AND STAGE I VAPOR RECOVERY RISERS & ANNULAR RISER SHALL BE GROUNDED TO PREVENT STATIC DISCHARGE DURING FILLING N i <br /> FUELING POSITION #1 IS ALWAYS THE OUTBOARD SIDE OF THE FIRST \� \ OPERATIONS. SEE TANK ELECTRICAL DRAWINGS. V1 > j Q <br /> II DISPENSER ON THE ENTRANCE SIDE AND NON EXPANSION SIDE OF THE i }; N <br /> CANOPY. OPPOSITE SIDE SHALL BE FUELING POSITION #2 AS SHOWN. 18 ALL NEW PIPING AND TANKS TO BE INSTALLED PER MANUFACTURERS RECOMMENDATIONS AND INSTALLATION INSTRUCTIONS. CONTRACTOR SHALL USE FLEXIBLE m O N N 0 <br /> ''- CONNECTORS FROM THE TANK SUMPS TO THE VAPOR RECOVERY MANIFOLD. THERE SHALL BE A MINIMUM FOR 4 FEET OF PIPING RUN PRIOR TO PENETRATION � <br /> NOTE FUEL POSITION DECAL NUMBERS ARE PROVIDED BY OWNER AND m V Y L <br /> „ INSTALLED BY START UP TECHNICIAN. INTO ANY SUMP OR CHANGE OF DIRECTION OF MORE THAN 30 DEGREES PER MANUFACTURERS INSTALLATION REQUIREMENTS. N <br /> 0 <br /> 19 THE OWNER'S REAL ESTATE DEPARTMENT WILL IDENTIFY THE UST AGENCY HAVING JURISDICTION, ALL INITIAL DELIVERY REQUIREMENTS AND FORMS AND SEND TO <br /> CONSULTING ENGINEER (MULVANNYG2 PM) FOR DISTRIBUTION AND SIGNATURES. CONSULTING ENGINEER (MULVANNYG2 PM) SHALL SECURE THE OWNER'S AND 0- <br /> T INSTALLER'S SIGNATURES AND DISTRIBUTE FORMS TO THE REAL ESTATE DEPARTMENT, THE OWNER'S GASOLINE OPERATIONS DEPARTMENT, THE GENERAL LLJ <br /> 1 CONTRACTOR AND THE UST AGENCY HAVING JURISDICTION. REQUIRED FORMS TYPICALLY INCLUDE, BUT ARE NOT LIMITED TO UST REGISTRATION, UST NOTIFICATION N <br /> AND UST CERTIFICATION. ALL AUTHORITIES HAVING JURISDICTION INITIAL DELIVERY REQUIREMENTS SHALL BE SATISFIED AND WRITTEN DOCUMENTATION SENT TO o <br /> COSTCO WHOLESALE GASOLINE OPERATIONS PRIOR TO ORDERING GASOLINE. GASOLINE DELIVERY AND ALL TANK TESTING SHALL BE COMPLETE PRIOR TO OPENING. i <br /> UNDERGROUND TANK AND PIPING RETROFIT <br /> 20 CONTRACTOR TO INSTALL (1) NEW VEEDER-ROOT FLOW METER AT EACH NEW DISPENSER, AND A NEW VEEDER-ROOT VAPOR PRESSURE SENSOR AT DISPENSER <br /> LOCATED CLOSEST TO THE TANKS PER CARB EXECUTIVE ORDER VR-202 COMPLIANCE REQUIREMENTS. SEE SHEET T7-1 FOR INSTALLATION DETAILS. Q) <br /> 0 10 20 4o Call Toll Free � <br /> PIPING SITE PLAN 1 (800) 642-2444 21 CONTRACTOR TO INSTALL ARID PERMEATOR ON CONCRETE PAD. Ln <br /> o <br /> 0 <br /> 0 <br /> TWO 22 INSTALL NEW DOUBLE WALL FIBERGLASS PIPING TRANSITION SUMP AND TMS ADDITIVE INJECTION SYSTEM ON SUPPORT RACK. ROUTE HOSING FROM 0co <br /> i <br /> 1� = 10' WORKING DAYSQ INJECTION CABINET THROUGH VENT SUMP TO FILL SUMP RISES. � T o0 <br /> BEFORE YOU 9 z' 0N o <br /> DIG 0 i <br /> r <br /> a� <br /> i� <br />