Laserfiche WebLink
L0 <br /> Q � <br /> w < <br /> p <br /> o � � N J <br /> N z U <br /> LLJ <br /> � � Ow � Q <br /> z L <br /> Qw <br /> z � � <br /> 0 <br /> Q z J � Q Z <br /> LLJ <br /> M Q Q U J <br /> o O <br /> H z O <br /> V' Q Q <br /> Of = Of <br /> O 11: O <br /> a_ U <br /> Q Z O F- <br /> 0 <br /> CD CD CD FL L U <br /> C CV <br /> H <br /> C") Cf) <br /> 0 0 0 0 0 O <br /> Y z <br /> U <br /> 000 >1 Q U <br /> mmmm <br /> r <M - <br /> O � <br /> � 00 r- O <br /> Z <br /> A Not Used Not Used Not Used <br /> T4-1 SCALE: NONE T4-1 SCALE: NONE T4-1 SCALE: NONE <br /> W <br /> � w <br /> J <br /> Qo <br /> CA > OD <br /> J <br /> ffa) <br /> Opa <br /> 1: W <br /> �: �Z _ <br /> OJQ <br /> U � <br /> o0) <br /> C0 <br /> U � <br /> L <br /> LL <br /> O QRpFESSIOHgI <br /> HAL P. GRUBB ?� <br /> B Not Used (--ENot Used H Not Used 67814 <br /> T4-1 SCALE: NONE SCALE: NONE �T4-1SCALE: NONE �qT / v 1 ��"I <br /> �_i <br /> BRINE SUMP RESERVOIR & 26 37 TURBINE 38 2 HP VARIABLE SPEED TURBINE W/ F OF CAk-�F 05/27/22 <br /> NOTE. THICKENED SLAB HYDROSTATIC SENSOR ACCESS 40 .1 GPH PLLD (SEE NOTE # 7) Sheet Notes <br /> THE TURBINE PUMP HEADS SHOULD SEE NOTE #4 18 TYP. MANHOLE 41 2 HP VARIABLE SPEED TURBINE <br /> 1 " CONDUIT AND EXPLOSION PROOF 30 BE ROTATED SUCH THAT THEY W/ (NON–VENTED CHECK VALVE o Q Q <br /> JUNCTION BOX (TYP.) (SEE NOTE #5) ALLOW THE REMOVAL OF THE 2 CROWN MIN. ONS VE PUMP) (SEE NOTE #7) 1 . – PIPE & CONDUIT PENETRATIONS: `) Lj Z Z X <br /> PROBE SEE NOTE #4 . <br /> O o p o a ALL PENETRATIONS OF THE TANK SUMPS SHALL BE SEALED WITH FRP BONDED DOUBLE BULKHEAD FITTINGS TO ENSURE THE o <br /> X\� F o b, 0 0 a PRODUCT LINE PROPER INSTALLATION OF ALL BULKHEAD FITTINGS AND RESULTANT WATER TIGHTNESS. ALL PIPING, CONDUIT AND GROUNDS THAT <br /> S, _ 73 3" FRP BONDED FITTING (TYP.) a ° TRACER TAPE PENETRATE THE SUMP SIDE WALLS MUST BE SEALED IN SUMPS. SUMPS SHALL BE HYDROSTATICALLY TESTED WITH STANDING WATER m > N <br /> FIBER GLASS SYSTEMS T4 1 p o o ° (6 MIN. 12 MAX.) FOR A PERIOD OF 24 HOURS TO INSURE THAT THE SUMPS ARE WATERTIGHT. <br /> 3" OVER 2" FRP PIPING 110 116 110 116 3" OVER 2" FRP 3" MIN. CLEARANCE (TYP.) 2. – NOT USED c Y a <br /> rn 3 o o <br /> VACUUM CROSS–OVER (TYP.) VENT PIPING (TYP.) MANOMETER & HDPE TUBING TO FACE SEAL ADAPTER (TYP.) 3. – SUMP SENSORS: a <br /> 3" FRP BONDED FITTING TYP. 4"x4"x2" EXTRACTOR TEE TEST PORT FOR CONTINUITY TESTING SENSOR TO BE MOUNTED AT SIDE OF TANK WHERE PRODUCT PENETRATION INTO SUMP IS MADE AND BELOW LOWEST PENETRATION cc <br /> (TYP.) 73 22 1 48 47 FITTING WITH CAP TANK LEVEL GAUGE 5 203 2 EZ–FIT X MALE HEX PROBE LOCATION ADAPTER (TYP.) FITTING WITHIN SUMP AREA. MOUNT SENSOR FLUSH TO LOWEST POINT IN SUMP BOTTOM. ALL TANK SUMP SENSORS SHALL BE <br /> CV E N <br /> 2" EZ–FIT CLAMP W/ 200 43 2"x18" FLEXIBLE CONNECTOR EXPLOSION PROOF JUNCTION NON–DISCRIMINATING, POSITION SENSITIVE. N <br /> O <br /> CD <br /> VITON SEAL (TYP.) W/ EZ–FIT MALE X EX FLANGE BOX (SEE NOTE #5) 30 62 BALL VALVE–FULL PORT (TYP.) 4. – MANHOLE CROWNS & TANK SLAB DEPTH AT SUMP: <br /> � VACUUM SENSOR ASSEMBLY �� �� i O N <br /> 2" EZ–FIT X EZ–FIT ADAPTER (TYP.) 206 SUMP SENSOR IN TWISTED CABLES ROUTED TO 25 ALL MANHOLE OPENINGS ON THE TANK SLAB SHALL BE INSTALLED WITH A 2 X 18 RUN CROWN OF CONCRETE TO PREVENT <br /> 31 VAC & FLOAT SENSORS (TYP.) & MOUNTING BRACKET KIT WATER INTRUSION INTO THE MANHOLE. TANK SLAB SHALL BE THICKENED AT TANK SUMP TO BE JUST BELOW TOP OF TANK SUMP 4-1M E <br /> 54" 8–SIDED FIBERGLASS 4 HOLDER (SEE NOTE #3) SECONDARY CONTAINMENT TERMINATION. :3 t � <br /> CONTAINMENT SUMP o 1 "C W EXPLOSION PROOF 1 " FRP BONDED CONDUIT •— O <br /> 73 3 FRP BONDED / 30 71 5. – U.G. CONDUIT: M <br /> SEAL–OFF (SEE NOTE #5) PENETRATION FITTINGS <br /> TANK LEVEL PROBE 51 48 47 ® O FITTING (TYP.) ALL U.G. CONDUIT TO TANK SUMPS SHALL BE ROBROY RIGID STEEL PVC COATED SCHEDULE 40 (NO SUBSTITUTIONS). CONDUIT w : <br /> _ CONTRACTOR SUPPLIED UNISTRUT & 1 RIGID CONDUIT N <br /> 110 116 3" OVER 2" FRP CLAMPS FOR CONDUIT SUPPORT. 30 (SEE NOTE #5) MINIMUM BURY DEPTH IS 24 PER CODE. ALL JUNCTION BOXES SHALL BE CLASS 1 DIV. 2 RATED. ALL ELECTRICAL CONDUIT INclaim Mo <br /> SUMP FLAME ARRESTOR 63 FIBER GLASS SYSTEMS 3" SUMPS SHALL INCLUDE A SEAL–OFF ENTERING AND LEAVING. SEAL–OFFS SHALL BE INSTALLED 6 MIN. ABOVE HIGHEST Q 0 N <br /> o °� PIPING TO ATTACH TO RISER WITH U–BOLT 110 PENETRATION IN SUMP. '— rn N <br /> 2"x18" FLEXIBLE CONNECTOR W/ o o DISPENSERS (TYP.) CLAMP. (TYP. @ ALL CONDUITS) OVER 2 FRP PIPING VACUUM M ' Q o <br /> 43 _ CROSS–OVER SHOWN THIS 6. – STAINLESS STEEL FITTINGS: r i <br /> EZ FIT X EZ FIT FLANGE (TYP.) - 204 2 EZ–FIT X FEMALE GLUE 116 VIEW FOR CLARITY TYP. CONTRACTOR TO PROVIDE ALL MISCELLANEOUS NPT FITTINGS AND NIPPLES FOR CONNECTIONS TO TURBINES, SIPHON SYSTEM +.; N o <br /> 1 2 HP VARIABLE SPEED PIPE FOR FIBERGLASS PIPING 54 DW V8–SIDED (TYP.) <br /> ( ) 38 40 FIBERGLASS CONTAINMENT 4 AND VAPOR RECOVERY SYSTEM. ALL STAINLESS STEEL FITTINGS SHALL BE MANUFACTURED BY STANDARD PIPE PRODUCTS M O -N Y C: N <br /> TURBINE W/ (NON–VENTED SUMP 4 DOUBLE WALL TANK COLLAR OR EQUAL SPECIFICATIONS AS FOLLOWS: m V r N <br /> CHECK VALVE ON SLAVE 41 203 3 EZ–FIT X MALE HEX ADAPTER (TYP.) <br /> PUMP) (SEE NOTE #7) 1 TANK TOP S.S. FITTINGS DIMENSIONS MATERIAL THREAD PRESSURE RATING o <br /> Cn <br /> 2 HP VARIABLE SPEED TURBINE <br /> VACUUM TUBING TO DEVICES 40 38 PUMP (1 ) W/ 1 GPH PLLD (TEES, ELBOWS) w <br /> MONITORED IN FILL SUMP SECOND VACUUM SOURCE CLASS 150/PN 20 ASME B16.3 ASTM A-182 ASME B.1 20.1 ASME B16.3 <br /> 41 ( 2" EZ–FIT X EZ–FIT ADAPTER (TYP.) 206 SUMP SENSOR IN HOLDER S.S. UNIONS CD <br /> VACUUM SENSOR ASSEMBLY & 25 F REQ'D.) (SEE NOTE #7) D,31 (SEE NOTE #3) CLASS 150/PN 20 ASME B16.39 ASTM A-182 ASME B.1 20.1 ASME B16.3 <br /> MOUNTING BRACKET KIT T4-1 2 EZ–FIT CLAMP W/ 200 S.S. PIPE U <br /> VITON SEAL (TYP.) TURBINE EXTENDS TO WITHIN 6 <br /> CLASS 150/PN 20 ASTM A733 ASTM A-312 ASME B.1 20.1 ASME B16.3 <br /> 2" EZ–FIT TEE (TYP.) 202 OF BOTTOM OF TANK E <br /> TYP.) 201 <br /> 1/4" DRAIN/TEST BUSHING. FACTORY INSTALLED 7• – CORROSION PROOF: o <br /> 2" EZ–FIT 90 DEGREE ELBOW <br /> ( TO TEST FOR CONTINUITY. ALL TURBINE PUMP HEADS TO HAVE ADVANCED CORROSION PROOF PROTECTION WITH E–COATED FINISH. <br /> r Cn <br /> c Sum Plan View 40K Premium Unleaded Tank #5 F Sum Section View a 40K Premium Unleaded Tank #5 8. – TURBINE HEAD POSITIONING: z o U � CDCD <br /> CONTRACTOR TO INSTALL DUAL TURBINE SUMP HEADS SO THAT THEY ARE ORIENTED TO ALLOW CLEAR ACCESS FOR AUTOMATIC O N H <br /> T4-1 SCALE: 1 "=V-0" TANK GAUGE (ATG) REMOVAL. <br /> T – SCALE: 1 "=1 '-0" r <br />