Laserfiche WebLink
Watertight(WTE)Turbine Enclosures for Fiberglass Reinforced Plastic(FRP)Tanks from Containment Solutions <br /> Items#2&#3 <br /> HOOSE TOUR INDUSTKY Underground FRP Tanks <br /> PetroleumAccessories: Turbine Enclosures <br /> Lubricants / Automotive <br /> Waker /Wastewater Watertight FRP (WTE)Turbine Enclosure <br /> Chemical <br /> service The Watertight FRP Turbine Enclosure (WTE) body is mounted <br /> on the tank collar. If a leakproof joint is required, cement the <br /> enclosure body to the tank collar using the adhesive kit (Kit AD). <br /> (It is recommended that the joint always be cemented.) All turbine <br /> enclosures are supplied with adhesive kits. <br /> A minimum 36" diameter street box is required with all FRP <br /> models to allow the removal of the FRP lid after the turbine <br /> enclosure is installed. This also allows the removal of the manway <br /> cover. <br /> • About CSI <br /> • Cont-act (:$I To leak test the turbine enclosure, use a standing water test. DO <br /> • Links NOT use an air pressure test. <br /> • Search <br /> WTE Features: <br /> • Suitable for moderately high groundwater conditions <br /> • Includes an FRP enclosure body (variable length in 12" <br /> increments, 42" or 48" ID) <br /> • FRP reducer (42" x 30" or 48" x 30" ID's) with o-ring <br /> groove and o-ring gasket <br /> • Push-on FRP lid (32.5" OD) with two handles <br /> • Enclosure body is field cemented to the tank collar and the <br /> reducer is field cemented to the enclosure body using the <br /> supplied adhesive kits (Kit AD, two kits required) <br /> • Reducer/enclosure body joint is on the exterior of the <br /> enclosure body allowing easy field installation of the <br /> adhesive without entering the enclosure <br /> • Lid compresses the lubricated o-ring when it is pushed <br /> onto the reducer top, providing a watertight seal with water <br /> up to 12" over the lid <br /> • Lid can be pushed into position by standing on the lid - <br /> made with a non-skid exterior surface <br /> • Lid includes two handles: One is offset to aid in the <br /> removal of the lid and the other is centered on the lid <br /> • 30" opening allows for the removal of a 22" manway lid <br /> (28" OD) <br /> • Enclosure must be vented at all times <br /> http://www.containmentsolutions.com/products/underground_frp/accessories/turbine/WTE.html(1 of 3)4/20/2004 3:25:12 AM <br />