Laserfiche WebLink
The en. <br /> g / <br /> d, A etter will <br /> be required from the sewer district stating that they have capacity for the <br /> proposed project and that the increased load will not violate the Waste <br /> Discharge Requirements of the Regional Water Quality Control . <br /> 3 A letter from the water supplier will also be required stating that they have <br /> j capacity and that the system meets State standards. <br /> 4-/ IS(t C�c� <br />