Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-01-50 <br /> 3. The Traffic Impact Mitigation Fee may be required for this development. The fee is due and <br /> payable at the time of building permit application. (The fee currently is $1,560.00 per <br /> 1,000 gross square foot of building designated as office in the Lodi area. In addition, a fee <br /> of$164.60 per additional trip-ends generated by the parking and storage lot shall be assessed. <br /> The fee shall be automatically adjusted July 1 of each year by the Engineering Construction <br /> Cost Index as published by the Engineering News Record. A credit may be allowed if it can be <br /> verified that the existing development on this site was in operation on or after April 23, 1990.) <br /> (Resolutions 00-433) <br /> 4. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 5. Verification shall be obtained from the Solid Waste Division(468-3066) that this development <br /> has met the requirements of the Waste Plan Format for Development Projects. Final Site Plan <br /> is required upon submittal of verification. <br /> GK:BN:wc <br /> PS-IF175-W IE <br />