Laserfiche WebLink
M ,t <br /> Kerry Sullivan -2- <br /> COMMUNITY DEVELOPMENT <br /> PA-04-584(SA) <br /> 2. The Water Supply Facilities Impact Mitigation Fee may be required for this development. The fee is due <br /> and payable prior to issuance of the building permit. (The fee currently is$569.00 per 1,000 gross square <br /> foot of building designated as Retail Service. The fee shall be automatically increased on January 1 of <br /> each year through the year 2005 at the rate of 7.66 percent.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327,R-94-185 and R-97-5) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 4. Verification shall be obtained from the Solid Waste Division(468-3066)that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> NOTE: Any construction activity that results in the disturbance of at least one (1) acre of soil shall require a <br /> State NPDES construction permit. <br /> MRC:SH:ar <br /> P:\COMMENTS\SA\YR 2004\PA-0400584-pd <br />