Laserfiche WebLink
Implementation <br /> Actions and Implementation Responsibility for Oversight Agency Comments <br /> Mitigation Measure Timing Responsibility of Compliance/Verification Coordination <br /> 4.19-2c: Implement Measures to Action: Project Applicant San Joaquin County <br /> Encourage Telecommuting Encourage <br /> The Project applicant shall work with onsite telecommuting <br /> employers to encourage employee tele <br /> commuting and working at home on a part- Timing: <br /> Initials Initials <br /> time or full-time basis to the degree feasible. Prior to operation <br /> Encouraging telecommuting and alternative <br /> work schedules reduces the number of <br /> commute trips and therefore VMT traveled by <br /> employees. Alternative work schedules could Date Date <br /> take the form of staggered starting times, <br /> flexible schedules,or compressed work weeks. <br /> It is recognized that the ability of some <br /> employees to telecommute or work remotely is <br /> not feasible and therefore this measure shall <br /> be implemented to the degree practicable. <br /> Tribal and Cultural Resources <br /> 4.20-1a: Unanticipated Discovery. Action: Project Archaeologist San Joaquin County Buena Vista <br /> If any suspected TCRs are discovered during Halt construction if Rancheria of <br /> ground disturbing construction activities,all unanticipated Me-Wuk <br /> work shall cease within 100 feet of the find,or discovery is found Indians <br /> an agreed upon distance based on the nature Timing: <br /> of the find.The County shall invite a Tribal Initials Initials <br /> Representative from Buena Vista Rancheria of During ground <br /> Me-Wuk Indians to make recommendations disturbance <br /> about whether or not the discovery represents construction <br /> a TCR(PRC§21074)and,if so,to make <br /> recommendations for culturally-appropriate Date Date <br /> treatment. If the find includes human remains, <br /> the procedures outlined in Mitigation Measure <br /> 4.7-3a:Human Remains Discovery shall be <br /> followed.The contractor shall implement any <br /> measures determined by the County to be <br /> Section 1.0 Introduction 26 August 2022 <br />