My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014990
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WEST
>
11000
>
2600 - Land Use Program
>
PA-2000019
>
SU0014990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/6/2023 10:03:57 AM
Creation date
6/8/2022 4:42:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014990
PE
2620
FACILITY_NAME
PA-2000019
STREET_NUMBER
11000
Direction
N
STREET_NAME
WEST
STREET_TYPE
LN
City
LODI
Zip
95242-
APN
05908007, -29, -30
ENTERED_DATE
6/8/2022 12:00:00 AM
SITE_LOCATION
11000 N WEST LN
RECEIVED_DATE
6/6/2022 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 1.0 Introduction 5 August 2022 <br />Implementation <br />Actions and <br />Implementation <br />Responsibility for Oversight <br />Agency <br />Comments <br />Mitigation Measure <br />Timing <br />Responsibility <br />of Compliance/ Verification <br />Coordination <br />applicable fees, before issuance of the first <br />building permit. <br />Based on the findings of the air impact <br />assessment, the applicant shall pay the <br />SJVAPCD a monetary sum necessary to offset <br />the required operational emissions that are not <br />reduced by the emission reduction measures <br />contained in the air impact assessment. The <br />quantity of operational emissions that need to <br />be offset will be calculated in accordance with <br />the methodologies identified in Rule 9510, <br />Indirect Source Review, and approved by the <br />SJVAPCD. Operational emissions reduction <br />methods will be selected under the direction of <br />the SJVAPCD according to the air impact <br />assessment process detailed in, and required <br />by Rule 9510, Indirect Source Review (see <br />Rule 9510, subsection 5). <br />Biological Resources <br />4.6-1 a: Conduct Environmental <br />Action: <br />Project Biologist/ <br />San Joaquin County <br />Awareness Training for Construction <br />Environmental <br />Construction Contractor <br />Personnel. <br />Awareness <br />Before any construction work occurs on the <br />Training for <br />Project site, including grading, tree and/or <br />construction <br />vegetation removal (clear and grub), the <br />personnel. <br />Initials <br />Initials <br />County shall retain a qualified biologist <br />Timing: <br />(familiar with the resources in the area) to <br />conduct a mandatory contractor/worker <br />Prior to <br />environmental awareness training for <br />Construction. <br />construction personnel. The awareness <br />Date <br />Date <br />training will be provided to all construction <br />personnel (contractors and subcontractors) <br />prior to beginning construction to brief them on <br />Section 1.0 Introduction 5 August 2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.