Laserfiche WebLink
Table 1-1 <br />Gill Medical Center <br />Mitiqation Monitorinq and Reportinq Proqram <br />Section 1.0 Introduction 3 August 2022 <br />Implementation <br />Actions and <br />Implementation <br />Responsibility for Oversight <br />Agency <br />Comments <br />Mitigation Measure <br />Timing <br />Responsibility <br />of Compliance/ Verification <br />Coordination <br />Air Quality <br />4.5-2a: Prepare Air Impact Assessment <br />Action: <br />San Joaquin County/ <br />San Joaquin County <br />SJVAPCD <br />to Reduce Construction NO. Emissions <br />Prepare an Air <br />Construction Contractor <br />In accordance with SJVAPCD Rule 9510, a <br />Impact <br />detailed air impact assessment (AIA) shall be <br />Assessment. <br />prepared detailing the specific construction <br />Timing: <br />Initials <br />Initials <br />requirement (i.e., equipment required, hours of <br />use). In accordance with this rule, emissions of <br />Prior to the <br />NOx from construction equipment greater than <br />issuance of grading <br />50 horsepower used or associated with the <br />permits. <br />development Project shall be reduced by 20 <br />percent from baseline (unmitigated) emissions <br />and PM 10 shall be reduced by 45 percent. The <br />Date <br />Date <br />Project shall demonstrate compliance with <br />Rule 9510, including payment of all applicable <br />fees, before issuance of the first building <br />permit. <br />While the specific emission reduction <br />measures will be developed to the satisfaction <br />of the SJVAPCD, the following measures <br />would reduce short-term air quality impacts <br />attributable to the Proposed Project consistent <br />with Rule 9510: <br />• During all construction activities, all <br />diesel -fueled construction <br />equipment including, but not limited <br />to, rubber -tired dozers, graders, <br />scrapers, excavators, asphalt <br />paving equipment, cranes, and <br />tractors shall be California Air <br />Section 1.0 Introduction 3 August 2022 <br />