My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014992
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
W
>
WOODBRIDGE
>
403
>
2600 - Land Use Program
>
PA-2200070
>
SU0014992
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/20/2024 9:42:32 AM
Creation date
6/8/2022 4:48:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014992
PE
2659
FACILITY_NAME
PA-2200070
STREET_NUMBER
403
Direction
W
STREET_NAME
WOODBRIDGE
STREET_TYPE
RD
City
WOODBRIDGE
Zip
95258-
APN
01502002, -56, -57, -64, -65
ENTERED_DATE
6/8/2022 12:00:00 AM
SITE_LOCATION
403 W WOODBRIDGE RD
RECEIVED_DATE
1/26/2024 12:00:00 AM
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
128
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 SJCOG , Inc . <br /> S JC0G, Inc , <br /> San Joaquin County Multi-Speczes Habitat Conservation �' Open Space Plan <br /> 555 East Weber Avenue • Stockton, CA 95202 • (209) 235-0600 • FAX (209) 235-0438 <br /> • SJMSCP HOLD <br /> TO : Local Jurisdiction : Community Development Department , Planning Department , Building <br /> Department Engineering Department , Survey Department , Transportation Department , Public <br /> Works Department , <br /> Other : <br /> FROM : Laurel Boyd , SJCOG , Inc . <br /> DO NOT AUTHORIZE SITE DISTURBANCE <br /> DO NOT ISSUE A BUILDING PERMI I <br /> DO NOT ISSI FOR THIS PRr <br /> The landowner/developer for this site has requested coverage pursuant to the San Joaquin County Multi - <br /> Species Habitat Conservation and Open Space Plan ( SJMSCP ) . In accordance with that agreement , the <br /> Applicant has agreed to : <br /> 1 ) SJMSCP Incidental Take Minimization Measures and mitigation requirement : <br /> 1 . Incidental Take Minimization Measures (ITMMs) will be issued to the project and must be signed by the <br /> project applicant prior to any ground disturbance but no later than six (6) months from receipt of the ITMMs . <br /> r If ITMMs are not signed within six months, the applicant must reapply for SJMSCP Coverage . Upon receipt <br /> of signed ITMMs from project applicant, SJCOG, Inc . staff will sign the ITMMs . This is the effective date <br /> of the ITMMs . <br /> 2 . Under no circumstance shall ground disturbance occur without compliance and satisfaction of the ITMMs . <br /> 3 . Upon issuance of fully executed ITMMs and prior to any ground disturbance, the project applicant must : <br /> a. Post a bond for payment of the applicable SJMSCP fee covering the entirety of the project acreage <br /> being covered (the bond should be valid for no longer than a 6 month period) ; or <br /> b . Pay the appropriate SJMSCP fee for the entirety of the project acreage being covered; or <br /> c . Dedicate land in- lieu of fees, either as conservation easements or fee title ; or <br /> d . Purchase approved mitigation bank credits . <br /> 4 . Within 6 months from the effective date of the ITMMs or issuance of a building permit, whichever occurs <br /> first, the project applicant must : <br /> a. Pay the appropriate SJMSCP for the entirety of the project acreage being covered ; or <br /> b . Dedicate land in-lieu of fees, either as conservation easements or fee title ; or <br /> c . Purchase approved mitigation bank credits . <br /> Failure to satisfy the obligations of the mitigation fee shall subject the bond to be called . <br /> Project Title : PA-2000217 ( GP ) , PA-2000218 ( SU ) , PA-2200021 ( ZR) , PA-2200070 (WC ) <br /> Landowner: Redeeming Way , LLC Applicant : Dillon & Murphy <br /> Assessor Parcel #s : 015 = 020 -26 , -295 - 56 , - 57 <br /> T , R., Section (s ) : <br /> Local Jurisdiction Contact : Alisa Goulart <br /> The LOCAL JURISDICTION retains responsibility for ensuring that the appropriate <br /> Incidental Take Minimization Measures are properly implemented and monitored and that <br /> appropriate fees are paid in compliance with the SJMSCP . <br />
The URL can be used to link to this page
Your browser does not support the video tag.