Laserfiche WebLink
o% LEAK DETECTION <br /> 1' E C H N U L U G l E S <br /> Exclusive Providers for MDleak@, MCleak@ and PHDleak@ Technologies <br /> 2765 East Wieding Road • Tucson,AZ 85706 • Phone 855-255-5325 • FAX: 520.990.8965 <br /> Operations@LeakDetect.net • www.LeakDetect.net <br /> Signed Non-Disturbance Post ELD Contractor Statement <br /> Reference: <br /> Leak Detection Technologies, Reference Number <br /> Site Name Loves Travel Stop and County Store <br /> Site Address 1553 Colony Rd. <br /> City Ripon, Ca California Zip 95366 <br /> Contractor: <br /> California License # 673853 <br /> Company Name western Pump <br /> Address 3235 F St . <br /> City San Diego State Ca Zip 92102 <br /> Per the office of the State Water Resource Control Board, we are required to provide a signed agreement <br /> (below), which states that there is to be no further ground penetrating work, including beautification <br /> requirements, atop or immediately adjacent to, the UST system are needed or will be performed after Final <br /> ELD testing is performed. Therefore, all construction and landscaping above and adjacent to the UST system <br /> must be completed before our arrival to perform the ELD final test. <br /> Leak Detection technologies also requires all ballast to be removed from tanks containing a liquid filled <br /> interstice 72 hours prior to our technician arrival onsite to perform the final ELD test. Furthermore, no fluid can <br /> be added or removed from the tank primary 72-hour before testing. <br /> Containment Solution (CSI) wet interstice tanks must have brine added to the interstice to 4 inches above the <br /> interstitial reservoir or 4 inches above the bottom of the riser pipe attached to the top of the reservoir. Please <br /> complete this effort within 72 hours or greater of our arrival. Do not fill the riser pipe above the 4-inch level <br /> indicated herein. <br /> LDT has completed this form on behalf of the above, once this form is signed, dated, and returned to our office, <br /> we will notify the appropriate department at the State Water Resource on your behalf. Once this form has been <br /> completed and delivered to the state, the final ELD test dates can be confirmed. <br /> Please sign, print name and date below. <br /> Statement: No further ground penetrating work, including beautification requirements, atop <br /> or immediately adjacent to, the UST system are needed or will be performed <br /> after the Final ELD testing is performed at the above-referenced location. <br /> Greg McLucas o G ' <br /> Contractor: oa,e,o= ,o„ 5-0800 Date: 11 . 10 . 2022 <br /> Signature <br /> Print Name: Greg McLucas <br /> Author David Rabb 10f 1 <br />