Laserfiche WebLink
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENT <br /> PA-04-226 (SA) <br /> 2. The Water Supply Facilities Impact Mitigation Fee shall be required for this development. The fee is due <br /> and payable prior to issuance of the building permit. (The fee currently is $228.00 per 1,000 gross square <br /> foot of building designated as Manufacturing. The fee shall be automatically increased on January 1 of <br /> each year through the year 2005 at the rate of 7.66 percent.) <br /> (Development Title Section 9-818.4 and Resolutions R-91-327,R-94-185 and R-97-5) <br /> 3. A copy of the Final Site Plan shall be submitted prior to release of building permit. <br /> 4. Verification shall be obtained from the Solid Waste Division (468-3066) that this development has met <br /> the requirements of the Waste Plan Format for Development Projects. Final Site Plan is required upon <br /> submittal of verification. <br /> NOTE: Any construction activity that results in the disturbance of at least one(1) acre of soil shall require a <br /> State NPDES construction permit. <br /> DTP:DG:ar <br /> PACOMMENTSISAWR 2004TA-0400226—pd <br />