My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014666
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
K
>
KASSON
>
23122
>
2600 - Land Use Program
>
GP-99-3
>
SU0014666
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:24:12 PM
Creation date
6/16/2022 3:15:53 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014666
PE
2600
FACILITY_NAME
GP-99-3
STREET_NUMBER
23122
Direction
S
STREET_NAME
KASSON
STREET_TYPE
RD
City
TRACY
APN
23906005
ENTERED_DATE
12/21/2021 12:00:00 AM
SITE_LOCATION
23122 S KASSON RD
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
258
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ms. Jennifer Jolley <br /> September 26, 2003 <br /> Page 2 <br /> 2. In addition, there is a hazardous materials disclosure survey form attached showing <br /> that there will be some form of hazardous materials on the site. The environmental <br /> documentation should include identification of hazardous materials and measures to <br /> contain such materials from contamination to the traveling public on I-5. <br /> 3. Please send us a copy of the environmental document [Initial Study for Negative <br /> Declaration (with or without mitigation measures)] or the Draft Environmental <br /> Impact Report when it is available. <br /> 4. It is possible that an encroachment permit would be required. The enclosed <br /> information (see attachment) is to assist the applicant in the permit process. The <br /> approved Environmental Document for the project must be included in the permit <br /> application. <br /> The developer needs to ensure that the existing State drainage facilities will not be <br /> significantly impacted by the project. If historical undeveloped topography shows <br /> drainage from this site flowed into the State right-of-way, it may continue to do so with <br /> the conditions that peak flows may not be increased from the pre-construction quantity <br /> and the site runoff be treated to meet present storm water quality standards. If historical <br /> undeveloped topography shows drainage from this site did not flow into the State right- <br /> of-way, then it will not be allowed to flow into the State right-of-way at this time. <br /> Please forward all Final Conditions of Approval including any mitigation measures that <br /> are being proposed as well as any other documents and reports (i.e. all forms of <br /> environmental documents, Traffic Impact Study Reports, site and location maps, etc) on <br /> this proposed project for our review, comment, and records. If you are aware of any <br /> controversy regarding any of our requirements, please contact us as soon as possible so <br /> we may work together to resolve them before submittal to your Board. <br /> If you have any questions or would like to discuss these comments in more detail, please <br /> contact Lynn O'Connor at (209) 948-7575 (email: loconnor@dot.ca.gov). <br /> Sincerely, <br /> TOM DUMAS, Chief <br /> Office of Intermodal Planning <br /> Enclosure <br /> "Caltrans improves mobility across California" <br /> 606NO3)MLUYAXSI I ERSI"IA.NOSCME <br /> MWNOR. <br />
The URL can be used to link to this page
Your browser does not support the video tag.