Laserfiche WebLink
ZONE REc�s �FIca rIoN <br /> 2.' '•yam <br /> r <br /> SAN JOAQUIN COUNTY COMMUNITYDEVELOPMENTDEPARTMENT <br /> 1810 EAST HAZELTON AVENUE,STOCKTON,CA 95205 <br /> TELEPHONE: (209)468-3120 <br /> BUSINESS HOURS: 8:00 a.m.to 5:00 p.m. <br /> (Mondaythrough Friday) <br /> 9STEP <br /> s ,,,:._ -. .1 CHECK WITH STAFF-Development Services Staff will explain the requirements and procedures to you. <br /> 2 SUBMIT YOUR APPLICATION, When you apply, Ills all of the following: <br /> • FEE The staff will let you know the current cost of riling an application. Make checks payable to the <br /> San Joaquin County Treasurer. <br /> • FORM Fourteen(14)copies of the completed application information forms(attached)which all <br /> owners must sign. <br /> MAP Fourteen(14)copies of the assessor page(s)with the area to be rezoned outlined. Label the <br /> map with both the"existing"and proposed"zoning. of the plan. <br /> • DEED One copy of the recorded deed(s)of the property. <br /> SERVICES If your project requires connection to public facilities,you must submit a"will-serve"letter from <br /> the appropriate water, sewer and drainage entities at the time of filing. This letter must include <br /> a statement from the agency that they will serve the proposed development, and has,or will <br /> have, the capacity to provide such service. <br /> • SOIL SUITABILITY If the proposed method of sewage disposal is on-site,and this is permissible,submit a Soil <br /> STUDY Suitability Study prepared to the specifications of the Environmental Health Division. Submit <br /> this study to the Environmental Health Division prior to submitting this application. <br /> • APPLICATION Staff will check your application. If anything is missing,you will be notified in writing. The <br /> COMPLETE applicant will be sent a postcard once the application has been determined complete. (Your <br /> plication cannot be processed until it is complete.) <br /> STEP 3 APPLICATION PROCESSING <br /> • PREAPPLICATION A preapplication conference may be required for a proposed Zone Reclassification if the size, <br /> CONFERENCE location,or complexity warrant. Check with the staff to see if a preapplication conference will <br /> be required prior to submitting a full application. <br /> • CEQA The County will decide if the proposal will have an adverse effect on the environment. 1(there <br /> are no adverse effects, the application will be processed. If there are potential adverse effects, <br /> further environmental review will be required. Projects that have the potential to adversely <br /> affect the environment will require the preparation of an E.I.R. This may extend the processing <br /> time. <br /> REFERRALS AND Staff will refer the application to any County departments,other agencies and surrounding <br /> • ACTION property owners affected by your proposal. At the end of a review and comment period a staff <br /> report will be prepared and the Planning Commission will hold a public hearing. At the <br /> conclusion of the hearing the Commission will either refer the application to the Board of <br /> Supervisors with a favorable recommendation or deny the request. The Board of Supervisors <br /> will then hold a public hearing and take final action on your request(Note:Planning <br /> Commission denials must be appealed in order to be heard by the Board of Supervisors). <br /> • FINAL ACTION The Board of Supervisors action is final. <br /> STEP 4 CONDITIONS AND ADDITIONAL PERMITS <br /> • CONDITIONS The staff will send you the final action and if it is approval it will list any conditions of the <br /> rezoning. <br /> • SANITATION& Projects that will utilize new on-site sanitation disposal and/or on-site wells,must get permits <br /> WELL PERMITS from the Environmental Health Division. <br /> • BUSINESS If the project Involves a business, a Business License must be approved prior to starting <br /> LICENSES operation. Business License applications can be processed concurrently with the Site <br /> Aporoval application. <br /> • BUILDING If the project involves construction a building permit must be approved prior to commencement <br /> PERMITS of work. <br /> • OTHER PERMITS Frequently other local, state and/or federal agencies will require permits prior to new uses <br /> being established(e.g.Air Pollution Control District,Regional Water Quality Control Board, <br /> Fish&Game, Fish&Wildlife or the Sheriffs Office). The Community Development <br /> Department will identify additional permits we are aware of that may be required for your <br /> project. <br /> PA ZR.FRM Rev.November 14,7000 <br /> -1- <br />