Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project Action or <br /> Consis Conditions o <br /> Section tency Approval <br /> I Heading# Title Text Y/N/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> Buffer areas and setbacks shall be no larger than <br /> Community necessary,and shall consist of usable,easily See#382. The developer plans to plant the setback <br /> 384 4.3.I.P.c Edges maintainable areas and treatments. Y area with low maintenance ground cover. COA-49 <br /> Edge treatments shall be installed no later than at <br /> construction of adjacent roadways. In no case shall Y,as <br /> Community edge treatments be installed later than the development condition The project shall be conditioned to meet this <br /> 385 4.3.1.P.d Edges of adjacent land uses. ed requirement. COA-49 <br /> Drainage facilities are provided on the western right-of <br /> Edge treatments shall include provisions for the way of Mountain House Parkway such that drainage <br /> conveyance of runoff from a 100-year flood event facilities serving Mountain House are not needed on COA-5, 11, <br /> Community occurring from either upstream drainage facilities or the east side of the Parkway. See Neighborhood "F" G55632,94, <br /> 386 4.3.1.P.e Edges from overland sheet flow. Y Storm Water Report. 96 <br /> Edge Treatments in Specific Plans. Specific <br /> provisions for edge treatments,consistent with the <br /> Community Master Plan shall be included in applicable Specific <br /> 387 4.3.I.I.a Edges Plans. N/A Not applicable at Tentative Map stage. None. <br /> West Edge <br /> 388 4.3.2 Treatment <br /> West Edge Edge treatments along the west edge shall be designed <br /> 389 4.3.2.P.a Treatment to mitigate any potential impacts from aerial spraying. N/A Not applicable to Neighborhood F None. <br /> J <br /> 10/03/2000 MHMP.CHECKLIST-928 Page85 <br />