Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project Action or <br /> Consis- Conditions o <br /> Section tency Approval <br /> 1 Heading# Title Text Y/N/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> The eastern edge of the community shall consist of a <br /> linear corridor that serves as a buffer to adjacent <br /> agricultural areas and as an important entry into the <br /> community.The corridor shall include: A multiple <br /> lane,divided Arterial roadway replacing the existing <br /> Patterson Pass. <br /> A minimum setback of 32 feet from the west edge of <br /> the roadway right-of-way to the nearest building. <br /> An open rail fence planted with vines along the <br /> property boundary. <br /> Large,evergreen screening shrubs planted along the <br /> fence line. <br /> An underground easement for storm drainage <br /> paralleling the eastern property line. <br /> Multiple rows of trees along both sides and the <br /> median and other landscaping. <br /> A multi-use path along the west side of the roadway. <br /> Buffers and required setbacks as described in roadwa <br /> Community sections(see Chapter Nine: Transportation and <br /> Edge at Byron Circulation, Figures 9.21 to 9.26) <br /> 401 4.3.3.P.e(b) Road N/A Not applicable to Tentative Map. None. <br /> Treatment of the wastewater treatment plant site and <br /> general industrial uses shall include: A landscape <br /> buffer planted with tree windrows and large screening <br /> Community shrubs,west of the Irrigation Canal. The buffer shall <br /> East Edge at occur within the required 10-foot parking setback or <br /> Public 15-foot building setback. <br /> Use/General A fence along the property boundary. <br /> 402 4.3.3.P.f Industrial N/A Not applicable to Tentative Map. None. <br /> 10/03/2000 MHMP.CHECKLIST-928 Page91 <br />