Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project Action or <br /> Consis- Conditions o <br /> Section tency Approval <br /> 1 Heading# Title Text Y/N/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> School Facilities Master Plan. As described in the <br /> County General Plan,the school district's School <br /> Facilities Master Plan shall accurately document its <br /> existing facilities,provide future school facilities <br /> projections(both short and long term),demonstrate the <br /> use of the current and projected revenues which are <br /> anticipated to meet those needs,document the district's <br /> reasonable good faith efforts to seek all available <br /> funding,and provide a current representation <br /> regarding the prospects for seeking and/or obtaining <br /> 532 5.4.1.I.a School Phasing funds in the reasonably foreseeable future. N/A Not applicable to Tentative Map stage. None. <br /> Phasing of Schools and Infrastructure. School sites <br /> and public infrastructure and services shall be provided <br /> to allow opening of schools as scheduled in the school <br /> plan. This will include requiring installation of <br /> sidewalks along all streets at the time of construction Y,as Sidewalks and pathways along streets are conditioned <br /> to ensure that there will always be safe routes to an condition so as to be constructed at the time of school <br /> 533 5.4.1.1.b School Phasing existing school as the neighborhood builds out. ed construction. COA-52, 56 <br /> 10/03/2000 MHMP.CHECKLIST-928 Page122 <br />