Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project Action or <br /> Consis- Conditions o <br /> Section tency Approval <br /> 1 Heading# Title Text Y/N/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> Should the National Park Service decide to extend the <br /> De Anza Trail into the Mountain House area,the trail <br /> shall be accommodated through connections to the <br /> Mountain House pedestrian and bicycle network,and <br /> identified with signage. The most likely alignment <br /> would be to provide trail routing along proposed Class <br /> bike lanes that parallel Marina Boulevard from Kelso <br /> 781 7.2.10.P.d Regional Trails Road to Grant Line Road. N/A Not applicable at Tentative Map stage. None. <br /> Design. Design of paths, including alignment, <br /> standards, signage, location of trailheads or staging The proposed paths shown on the Pedestrian, Bicycle, <br /> areas,and timing of construction and maintenance and Transit Plan shall be designed and constructed in <br /> shall be provided in the Parks and Open Space Plan accordance with the CSD construction standards and <br /> 782 7.2.10.I.a Regional Trails (see Section 7.2.2: Recreation System). Y the Roadway Landscaping Plan. COA-52,56 <br /> Trail Connections, Specific Plans for the affected area <br /> shall incorporate provisions of the Parks and Open <br /> Space Plan and provide for the design and location of <br /> on-site regional trails and provide for linkages to <br /> destinations within the community,especially <br /> Mountain House Creek Community Park and Old <br /> River Regional Park. These trails include those <br /> planned by the East Bay Regional Park District,the <br /> Livermore Area Recreation and Park District,and the <br /> 783 7.2.10.1.b Regional Trails National Park Service(De Anza Trail). N/A Not applicable at Tentative Map stage. None. <br /> 10/03/2000 MHMP.CHECKLIST-928 Page168 <br />