Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project Action or <br /> Consis- - Conditions o <br /> Section tency Approval <br /> I Heading# Title Text YIN/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> Historical Structures, Each Specific Plan shall contain <br /> a determination by a qualified architectural historian as <br /> to whether any of the structures that are more than 50 <br /> years old would be affected by Specific Plan <br /> implementation. If Specific Plan implementation were <br /> determined to affect the structures,recommendations <br /> by the qualified professional shall be implemented; <br /> such mitigation measures could consist of avoidance o <br /> impacts by incorporating the structure into planned <br /> developments,detailed architectural documentation <br /> and history,or removal of a structure to another <br /> location. Each Specific Plan shall map the location of <br /> all structures 50 years or older that have been <br /> Cultural determined by a historian to be of historic significance, <br /> 875 7.4.1.17 Resources except for Specific Plan I. Y See# 868 None. <br /> PHASING AND <br /> 876 7.5 COSTS <br /> First-phase development of sport fields for team play <br /> is expected when approximately 800 units have been <br /> built. In addition to fields within neighborhood parks, <br /> the initial sports fields will be constructed on land <br /> reserved for the first high school and will later be <br /> transferred to the high school School District for their <br /> Capital Facility use. The park will be designed to serve existing and Y,as Construction will commence for the interim sports <br /> Cost and future residents and to act as an additional attractor for condition fields located north of the neighborhood,when the <br /> 877 17.5.La Phasing potential homebuyers. ed 800th residential building permit is issued. COA-17 <br /> 10/03/2000 MHMP.CHECKLIST-928 Page192 <br />