Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project,' Action or'` <br /> 'Consis- =�. �.. Conditions o <br /> Section tency Approval <br /> 1 Heading# Title Text Y/N/NA Finding of Fact/Analysis and,Evidence of Compliance (COA) <br /> The Rio Oso-Tesla transmission line easements shall <br /> be designated for open space uses when they pass <br /> through residential areas. Where the transmission lines <br /> pass through industrial,commercial,and public land <br /> uses they shall reflect that land use designation, but <br /> uses under or adjacent to the easement shall be <br /> restricted to uses compatible with the easement,such <br /> 890 8.2.P.e ELECTRICITY as parking lots. Y See 0887 None. <br /> PG&E Review. Each Specific Plan shall specify land <br /> uses and development standards within and adjacent to <br /> transmission lines. The County shall submit the <br /> Specific Plans to PG&E for review and comment on <br /> any proposed development in the vicinity of electric <br /> power utilities that cross the project site. As part of the <br /> development plan review and approval, PG&E shall be <br /> responsible for ensuring that the operation and <br /> condition of their electrical facilities are in compliance <br /> with PUC regulations for proposed land uses on and Condition of subsequent development approvals for <br /> 891 8.2.I.a ELECTRICITY adjacent to their easement. Y affected lands. COA-30 <br /> Approved Land Uses within Easements. The project's <br /> proposed land uses within PG&E's electric power <br /> transmission line easements of 230 kV shall be subject <br /> to PG&E approval and in compliance with PG&E <br /> 892 8.2.I.b ELECTRICITY approved land uses. Y See#891 COA-30 <br /> Easement Setbacks. Structure and setbacks outside but <br /> adjacent to powerline easements shall comply with the <br /> provisions of this Master Plan(see Section 6.9: <br /> 893 8.2.I.c ELECTRICITY Electric and Magnetic Fields). Y See 4891 COA-30 <br /> Section XX of the project description states that all <br /> Undergrounding of Lines, All electrical distribution permanent dry utilities within the Community will be <br /> 894 8.21d ELECTRICITY lines shall be underground where practical. Y installed underground. COA-75,82 <br /> 10/03/2000 MHMP.CHECKLIST-928 Page195 <br />