My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014674
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
20043
>
2600 - Land Use Program
>
SU-00-03
>
SU0014674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:34:36 PM
Creation date
6/16/2022 3:22:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014674
PE
2600
FACILITY_NAME
SU-00-03
STREET_NUMBER
20043
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
APN
20908020
ENTERED_DATE
12/21/2021 12:00:00 AM
SITE_LOCATION
20043 MOUNTAIN HOUSE PKWY
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1021
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project` ;Actton dr <br /> W <br /> ditionso <br /> Consis Con" <br /> Section tency Approval <br /> 1 Heading# Title Text Y/IJMA Finding'of FactlAnalysis"anis Evidence'of Compliance `"(COA)'_ <br /> Pipeline Relocation. A detailed proposal to relocate <br /> the eight-inch natural gas pipeline located north of <br /> Byron Road shall be included in the first residential <br /> neighborhood Specific Plan north of Byron Road. A <br /> preliminary response from PG&E regarding the A Pipeline Relocation Plan has been approved by <br /> proposed relocation shall be secured and documented PG&E. A copy of the Plan has been provided with the <br /> 901 8.3.I.c Natural Gas prior to approval of the Specific plan. Y application. COA-25, `7 <br /> TELECOMMU <br /> NI-CATIONS <br /> 902 8.4 SYSTEMS <br /> The CSD is currently in negotiations with potential <br /> Overall To provide Mountain House with extensive providers of telecommunication services to the <br /> Telecommunica-telecommunication services to satisfy current and Community. The provider shall comply with <br /> 903 8.4.I.O.a tions System anticipated future needs for the next several decades. Y requirements of the Master Plan. COA-39,67 <br /> The telecommunications transport system shall consist <br /> of a high speed digital fiber optics network. The hub <br /> of the network shall be centrally located. It shall be <br /> Overall the communication center and focal point for all forms <br /> Telecommunica-of telecommunications within the community and to <br /> 904 8.4.I.P.a tions System and from the community. Y See#903 COA-39,67 <br /> The backbone transmission facilities shall be <br /> Overall constructed underground to connect designated <br /> Telecommunica-substation in the individual subdivisions to the <br /> 905 8.4.I.P.b tions System communications center. Y See#903 COA-75, 82 <br /> Overall The underground backbone conduits shall be installed <br /> Telecommunica-to accommodate fiber optics and/or other cables COA-75,82, <br /> 906 8.4.I.P.c tions System required to satisfy the needs of a given service area. Y See#903 39,67 <br /> Uninterrupted Power Supply, Uninterrupted Power <br /> Overall Supply shall be provided via battery back-up for the <br /> Telecommunica-telephone service and any other declared"critical" <br /> 907 18.4.I.La tions System Icomponent((ire, security, life-support). Y See#903 COA-39,67 <br /> 10/03/2000 MHMP.CHECKLIST-928 Page197 <br />
The URL can be used to link to this page
Your browser does not support the video tag.