Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Protect �` Action or, <br /> << <br /> Consis= �� ��'' `m Condition's o <br /> Section tency Approval <br /> I Heading# Title Text YLN/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> Electrical transformers within residential <br /> neighborhoods shall be in underground vaults. Where <br /> located in commercial and industrial areas and in the <br /> SITING downtown area,transformers may be mounted above- <br /> CRITERIA ground provided they are adequately shielded by <br /> FOR PUBLIC landscaping. All setbacks shall comply with County Conditional of subsequent approval and improvement <br /> 928 8.5.P.f FACILITIES codes. Y plans. COA-67,FR <br /> PHASING AND <br /> 929 8.6 COSTS <br /> Installation costs associated with gas and electricity <br /> distribution are paid by the utility companies or <br /> agencies and recouped through charges to the end user. <br /> Installation of the telecommunications network will <br /> Capital Facility also be paid by the company providing the service and, <br /> Cost and ultimately,will be charged to end users through hook- CSD has adopted measures for utility rate charges and <br /> 930 8.6.La Phasing up fees. Y hook-up fees. None. <br /> Electrical power distribution will be installed on an as- <br /> needed basis as part of the on-site roadways. The only <br /> exceptions to this incremental construction will be the <br /> extension of the initial temporary service lines for the <br /> first Specific Plan and the siting and construction of <br /> the permanent community electrical substation. The <br /> Capital Facility initial service line extensions will require accelerated <br /> Cost and planning and construction to coincide with the start of <br /> 931 8.6.1.b Phasing residential development. Y COA-67,68 <br /> The detailed planning and design for the community <br /> electrical substation will begin immediately upon <br /> approval of the Master Plan. The planning and <br /> Capital Facility construction processes will take approximately five <br /> Cost and years,with completion in time for development of the CSD has reached agreement with Modesto Irrigation <br /> 932 8.6.Lc Phasing Isecond Specific Plan. Y I District to provide electricity and a substation. lNone. <br /> 10/03/2000 MHMP.CHECKLIST-928 Page201 <br />