My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014674
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
20043
>
2600 - Land Use Program
>
SU-00-03
>
SU0014674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:34:36 PM
Creation date
6/16/2022 3:22:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014674
PE
2600
FACILITY_NAME
SU-00-03
STREET_NUMBER
20043
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
APN
20908020
ENTERED_DATE
12/21/2021 12:00:00 AM
SITE_LOCATION
20043 MOUNTAIN HOUSE PKWY
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1021
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Protect �` Action or, <br /> << <br /> Consis= �� ��'' `m Condition's o <br /> Section tency Approval <br /> I Heading# Title Text YLN/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> Electrical transformers within residential <br /> neighborhoods shall be in underground vaults. Where <br /> located in commercial and industrial areas and in the <br /> SITING downtown area,transformers may be mounted above- <br /> CRITERIA ground provided they are adequately shielded by <br /> FOR PUBLIC landscaping. All setbacks shall comply with County Conditional of subsequent approval and improvement <br /> 928 8.5.P.f FACILITIES codes. Y plans. COA-67,FR <br /> PHASING AND <br /> 929 8.6 COSTS <br /> Installation costs associated with gas and electricity <br /> distribution are paid by the utility companies or <br /> agencies and recouped through charges to the end user. <br /> Installation of the telecommunications network will <br /> Capital Facility also be paid by the company providing the service and, <br /> Cost and ultimately,will be charged to end users through hook- CSD has adopted measures for utility rate charges and <br /> 930 8.6.La Phasing up fees. Y hook-up fees. None. <br /> Electrical power distribution will be installed on an as- <br /> needed basis as part of the on-site roadways. The only <br /> exceptions to this incremental construction will be the <br /> extension of the initial temporary service lines for the <br /> first Specific Plan and the siting and construction of <br /> the permanent community electrical substation. The <br /> Capital Facility initial service line extensions will require accelerated <br /> Cost and planning and construction to coincide with the start of <br /> 931 8.6.1.b Phasing residential development. Y COA-67,68 <br /> The detailed planning and design for the community <br /> electrical substation will begin immediately upon <br /> approval of the Master Plan. The planning and <br /> Capital Facility construction processes will take approximately five <br /> Cost and years,with completion in time for development of the CSD has reached agreement with Modesto Irrigation <br /> 932 8.6.Lc Phasing Isecond Specific Plan. Y I District to provide electricity and a substation. lNone. <br /> 10/03/2000 MHMP.CHECKLIST-928 Page201 <br />
The URL can be used to link to this page
Your browser does not support the video tag.