Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project` .x Action or <br /> Consis- ` * Conditions,o <br /> Section tency Approval <br /> 1 Heading# Title Text Y/N/NA Finding of Fact/Ana6is and Evidence of Compliance (COA) <br /> Sound Barriers. Noise studies required at the <br /> environmental review stage for Development Permits <br /> (see Section 1 1.3.1: Overall Mobile Noise Impacts) <br /> shall identify specific noise-reducing barriers sufficient Y,as <br /> Arterial to meet the needed mitigation for noise generated from condition <br /> 1174 11.3.31a Roadways roadways. ed See# 1 155 COA-27 <br /> To adequately consider noise impacts from the rail <br /> 1175 11.3.4.0.a Railroad line. N/A Not applicable to Neighborhood F. None. <br /> Land uses near the rail line shall be protected from <br /> noise impacts from rail line use. Noise mitigation <br /> structures shall be required along the edges of the <br /> 1 176 1 1.3.4.P.a Railroad railroad right of way abutting residential development. N/A Not applicable to Neighborhood F. None. <br /> S=ific Plan Requirements As part of the noise <br /> analysis prepared for Specific Plans located within <br /> 1000 feet of the rail line,a review of potential noise <br /> impacts from trains shall be conducted and appropriate <br /> 1177 11.3.4.1.a Railroad noise mitigation established. N/A Not applicable at Tentative Map stage. None. <br /> To adequately consider noise impacts from Byron The Mitigated Negative Declaration considered noise <br /> 1 178 1 1.3.5.O.a Byron Airport Airport. Y impacts from Byron Airport. None. <br /> The Mitigated Negative Declaration indicated that <br /> The community shall be protected from significant noise from the Byron Airport would constitute a less <br /> 1179 1 1.3.5.P.a Byron Airport noise impacts due to air traffic from Byron Airport. Y than significant impact. None. <br /> Monitorina. Increased traffic at Byron Airport shall be <br /> reviewed in each Specific Plan to determine if noise <br /> mitigation studies are warranted. If so,appropriate <br /> 1180 11.3.5.I.a Byron Airport Inoise mitigation shall be developed. N/A Not applicable at Tentative Map stage. None. <br /> 10/03/2000 MHMP.CHECKLIST-928 Page252 <br />