Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> �a, � �. P.. ifYL '�Y' <br /> Project �� �� *Acrion or <br /> Consis- Conditions o <br /> Section tency APProyal <br /> 1 Heading# Title Text YM/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> To provide the Mountain House community with <br /> adequate water storage facilities to ensure efficient <br /> system operation and"back up"supply in the event of <br /> 1249 12.3.7.0.a Water Storage an emergency or required system shutdown. Y See line 1230 None. <br /> Treated water storage facilities shall be provided to <br /> hold the required amount of operational,emergency <br /> and fire storage for the community at the various <br /> stages of development and at buildout of the <br /> .1250 12.3.7.P.a Water Storage community. Y See line 1230 None. <br /> Development Permits. Development permits shall be <br /> required for water storage facilities located off of the <br /> water treatment plant site. The Development Permit <br /> for the initial phase of the water treatment facility shall <br /> 1251 12.3.7.I.a Water Storage include water storage facilities. N/A See line 1248 None. <br /> Facilities Design. Where feasible, storage facilities <br /> shall be designed in a manner that allows for phased <br /> 1252 12.3.7.I.b Water Storage construction. Y See line 1230 None. <br /> Water Storage Permit. Prior to the submittal of any <br /> Tentative Map for development for any area over two <br /> miles from the water treatment plant,a Development <br /> Permit shall be required for water storage facilities. <br /> The permit application shall include an engineering <br /> study addressing the feasibility of constructing remote <br /> storage tanks. This measure applies to all development Neighborhood F not located over two miles from <br /> 1253 12.3.7.1.c Water Storage subsequent to Specific Plan 1. N/A facility. None. <br /> 10/03/2000 MHMP.CHECKLIST-928 Page270 <br />