Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project'� t> Action ori. <br /> �Consis < s Conditionso <br /> Section tency Approval <br /> 1 Heading# Title Text Y/N/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> WASTEWATE <br /> R <br /> TREATMENT <br /> 1287 13.5. PLANT <br /> To ensure that wastewater treatment processes be <br /> selected,designed,constructed,and operated to <br /> Wastewater provide adequate treatment capacity and water quality Operation of the wastewater treatment plant will be <br /> Treatment for the method(s)of disposal throughout project under the jurisdiction of the CSD which will comply <br /> 1288 13.5.1.0.a Process buildout. Y with Master Plan policies and requirements. None. <br /> Wastewater To provide not only process reliability but flexibility to <br /> Treatment adapt the process to meet the needs and technology of <br /> 1289 13.5.I.O.b Process the future. Y See# 1288 None. <br /> Wastewater Initial treatment processes shall be selected to meet the <br /> Treatment effluent quality required by economically feasible use <br /> 1290 13.5.1.P.a Process of reclaimed water and river discharge. Y See# 1288 None. <br /> Treatment processes shall be selected based on the <br /> most cost-effective process that meets regulatory <br /> Wastewater requirements and yields the highest amount of <br /> Treatment beneficial and economically feasible reuse of <br /> 1291 13.5.1.P. b Process reclaimed wastewater as well as river discharge. Y See# 1288 None. <br /> Wastewater Expansion of the wastewater treatment plant shall be ' <br /> Treatment constructed and completed before development Not applicable at this stage of development of the <br /> 1292 13.5.I.P.c Process exceeds the existing capacity. N/A Community. None. <br /> Engineering Report. The required Engineering Report <br /> Wastewater shall be completed and appropriate permits obtained <br /> "treatment from the regulatory agencies prior to the Final Map of Addressed in prior approved Use Permits and CSD <br /> 1293 13.5.1.1.a Process the first subdivision. Y approvals of Treatment Plant and facilities. None. <br /> 10/03/2000 MHMP.CHECKLIST-928 Page280 <br /> r <br />