My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014674
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
20043
>
2600 - Land Use Program
>
SU-00-03
>
SU0014674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:34:36 PM
Creation date
6/16/2022 3:22:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014674
PE
2600
FACILITY_NAME
SU-00-03
STREET_NUMBER
20043
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
APN
20908020
ENTERED_DATE
12/21/2021 12:00:00 AM
SITE_LOCATION
20043 MOUNTAIN HOUSE PKWY
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1021
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> PI0J8CtACt10t1 or, <br /> Gonsis 4 =' Conditions o <br /> Section tency ��� ..3 ` Approval . <br /> 1 Heading# Title Text Y/N/NA Finding of Fact/Ana lysis and Evidence of Compliance (COA) <br /> The approach taken for odor control shall include: (1) <br /> design details and good housekeeping to eliminate <br /> odor sources,(2)control of the raw wastewater <br /> discharged to the treatment plant,(3)the use of covers <br /> or chemicals if needed to control odors,and(4) <br /> 1312 13.6.P.a ODORS selection of processes that favor odor reduction. N/A See# 1311 None. <br /> I'lant Design. Odor control measures shall be <br /> incorporated in the plant design. Measures shall <br /> include selection of process and operations with low <br /> odor potential,properly sized units to maintain <br /> conservative process loading,and enclosing the <br /> principle sources of odors such as headworks. Odor <br /> treatment systems shall be provided to neutralize off- <br /> 1313 13.6.I.a ODORS gasses collected from enclosures. N/A See#1311 None. <br /> Setbacks. Storage ponds and sludge basins shall be <br /> 1314 13.6.I.b ODORS setback from property lines a minimum of 20 feet. N/A See# 1311 None. <br /> Odor Studies. Odor studies shall be conducted to <br /> identify the type and magnitude of odor sources, <br /> meteorological conditions,dispersion characteristics <br /> and adjacent developments if odor problem develops <br /> following startup and operation of the treatment Addressed as part of prior Use Permit Approvals for <br /> 1315 13.6.1.c ODORS facilities. Y facilities. None. <br /> Monitoring. Odor production shall be monitored <br /> following plant startup. If required, unit processes <br /> such as the sludge drying beds may be covered,or Addressed as part of prior Use Permit Approvals for <br /> 1316 13.6.I.d ODORS chemicals may be used,to control or eliminate odors. Y facilities. lNone. <br /> 10/03/2000 MHMP.CHECKLIST-928 Page284 <br />
The URL can be used to link to this page
Your browser does not support the video tag.