Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project Action or <br /> Consis- Conditions o <br /> Section tency Approval <br /> 1 Heading# Title Text Y/N/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> Wastewater collection, treatment, and ancillary <br /> facilities are estimated to cost approximately$60 <br /> million. Collection facilities have been designed to <br /> the extent possible to be phased in increments to <br /> correspond to the residential neighborhoods,except <br /> (hat the first Specific Plan will require additional <br /> connecting lines because it is not contiguous with the <br /> treatment plant. Initial treatment and storage facilities <br /> have been sized at about 10%of the community's <br /> Capital Facility buildout. This will serve one residential neighborhood <br /> Cost and and a corresponding balance of commercial, industrial, Addressed as part of prior Use Permit approvals for <br /> 1337 13.10.1.a Phasing and other non-residential land uses. Y facilities. None. <br /> The initial aerated lagoons and pumps will be sized to <br /> satisfy the demands of the first neighborhood. They <br /> will be replaced with a higher volume treatment <br /> facility upon commencement of the second Specific <br /> Plan, and will be expandable to accommodate future <br /> development phases. All line sizing will be engineered <br /> to handle through flows from successive <br /> Capital Facility neighborhoods in accordance with the Master Plan. <br /> Cost and Cost and phasing assumptions are discussed in more Addressed as part of prior Use Permit Approvals for <br /> 1338 13.10.Lb Phasing detail in the PFP. Y facilities. None. <br /> 10/03/2000 MHMP.CHECKLIST-928 Page289 <br />