Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project Action or <br /> Consis- Conditions o <br /> Section tency Approval <br /> I Heading# Title Text Y/N/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> SECONDARY <br /> STORM <br /> DRAIN <br /> COLLECTION <br /> 1371 15.5 SYSTEM <br /> SECONDARY <br /> STORM To insure that on-site drainage occurring over the Design of the secondary storm drain collection system <br /> DRAIN community be safely conveyed by the secondary storm Y, as shall comply with policies of the Master Plan and will <br /> COLLECTION drain collection system to the primary storm drain condition be reviewed with the improvements plans for the COA-4,37, <br /> 1372 15.5.0.a SYSTEM collection system. ed Neighborhood. 96 <br /> SECONDARY <br /> STORM The secondary storm drain collection system shall be <br /> DRAIN used to collect and convey on-site drainage to the Y, as <br /> COLLECTION primary storm system safely with adequate flood condition CCA-4, 37, <br /> 1373 15.5.P.a SYSTEM protection. ed See It 1372 96 <br /> SECONDARY <br /> STORM <br /> DRAIN The design and construction of the secondary storm Y, as <br /> COLLECTION drain collection system shall be based on the 10-year condition COA-4, 37, <br /> 1374 15.5.P.b SYSTEM storm event. ed See tt 1372 96 <br /> SECONDARY <br /> STORM Final Desiens. Each final design of a secondary storm <br /> DRAIN drain collection system shall be based on the design Y,as <br /> COLLECTION standards of the County and other sound engineering condition COA-4, 37, <br /> 1375 15.5.1.a SYSTEM practices. ed See# 1372 96 <br /> MOUNTAIN <br /> HOUSE <br /> CREEK <br /> IMPROVE- <br /> 1376 15.6 MENTS <br /> 10/03/2000 MHMP.CHECKLIST-928 Page297 <br />