Laserfiche WebLink
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project Action or <br /> Consis Conditions o <br /> Section ;tency Approval <br /> I Heading# Title Text Y/N/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> Wetlands. Within the community,the existing <br /> wetlands on Mountain House Creek shall be preserved <br /> by the construction of small earthen check berms <br /> within the floodplain. The function of these berms <br /> shall be to provide periodic inundation of the wetlands <br /> MOUNTAIN and to allow passage of flood events over the crest of <br /> HOUSE the structures. The bulk of flood flows will bypass the <br /> CREEK wetlands via the Floodplain. The berms will be <br /> IMPROVE- constructed at levels below the adjoining topography <br /> 1391 15.6.I.a.(7) MENTS to avoid berm failure and inundation. N/A See line 1379 None. <br /> MOUNTAIN <br /> HOUSE <br /> CREEK <br /> IMPROVE- Berms. Berms shall be constructed to trap sediment <br /> 1392 15.6.I.a.(8) MENTS thus reducing the sediment load to Old River. N/A See line 1379 None. <br /> MOUNTAIN Flood Control Structures. Flood control structures on <br /> 1 IOUSE Mountain House Creek(e.g. culverts at road crossings <br /> CREEK and culverts at the Southern Pacific Railroad crossing) <br /> IMPROVE- shall be constructed in the flood plain section of the <br /> 1393 15.6.1.a.(9) MENTS creek and shall not impact the existing creek channel. N/A See line 1379 None. <br /> 10/03/2000 MHMP.CHECKLIST-928 Page301 <br />