My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014674
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
20043
>
2600 - Land Use Program
>
SU-00-03
>
SU0014674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:34:36 PM
Creation date
6/16/2022 3:22:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014674
PE
2600
FACILITY_NAME
SU-00-03
STREET_NUMBER
20043
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
APN
20908020
ENTERED_DATE
12/21/2021 12:00:00 AM
SITE_LOCATION
20043 MOUNTAIN HOUSE PKWY
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1021
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE <br /> MASTER PLAN CONSISTENCY FINDINGS <br /> Project Action or <br /> Consis- Conditions o <br /> Section tency Approval <br /> 1 Heading# Title Text YM/NA Finding of Fact/Analysis and Evidence of Compliance (COA) <br /> Central Valley <br /> Regional Water <br /> Quality Control <br /> 1434 15.10.3 Board <br /> Central Valley <br /> RWQCB/NPDE <br /> S General <br /> 1435 15. 10.4 Pen-nit <br /> PHASING AND <br /> 1436 15.11 COSTS <br /> Construction between Mascot Drive and Grant Line <br /> Road will require a second trunk pipeline running <br /> under Patterson Pass Road north across the tracks to <br /> BMP ponds in the golf course fairways. If golf course <br /> development is not ready to proceed,temporary BMP <br /> ponds would have to be constructed. Construction <br /> Capital Facility south of Grant Line Road will require a trunk pipeline <br /> Cost and running north to Mascot Boulevard and an open <br /> 1437 15.1]A(a) Phasing channel from Mascot to Old River. N/A Not applicable to Neighborhood F. None. <br /> The three storm lines discussed above are independent <br /> of each other and can be built in any order;they are, <br /> however,projected to be built in the order presented, <br /> approximately five years apart. The main <br /> Capital Facility consideration will be the timing of construction of <br /> Cost and Patterson Pass Road,as coordinated planning will save <br /> 1438 15.11.1(b) Phasing tearing up new roadways to lay pipe. N/A Not applicable to Neighborhood F. None. <br /> Capital Facility Mountain House Creek flood improvements will be <br /> Cost and constructed as specified in the Mountain House Creek <br /> 1439 15.1 I.1(c) Phasing Corridor Plan,generally in the following sequence: <br /> 10/03/2000 MHMP.CHECKLIST-928 Page311 <br />
The URL can be used to link to this page
Your browser does not support the video tag.