Laserfiche WebLink
MOUNTAIN HOUSE <br /> SPECIFIC PLAN 1 CONSISTENCY FINDINGS <br /> Section Consist- Conditions <br /> Heading ency Finding of Fact and Evidence of of Approval <br /> 1 # Title Text YM/NA Compliance (COA) <br /> Student Generation: Table 5.1: Specific Plan Student Generation <br /> shows the assumed student generation per dwelling unit and the <br /> ultimate number of students at buildout for each of the Specific Plan <br /> CHAPTER FIVE: residential land use designations. The Specific Plan land use <br /> EDUCATION, designations will allow approximately 4,110 dwelling units <br /> CHILD CARE generating approximately 2,415 K-8 and 590-12 students at <br /> AND LIBRARY buildout. No senior housing or Town Center(M/X)housing units <br /> 105 5.2.A.b SERVICES are planned within the Specific Plan. <br /> The following section describes the provisions for Specific Plan <br /> S SCHOOL school facilities and services. Calculated demand and plans for <br /> FACILITIES school facilities and services are based upon buildout of the Specific <br /> 106 5.3 PLAN Plan Area. <br /> A School Facilities Master Plan shall be prepared by the School <br /> District following approval of this Specific Plan and- rior to <br /> submittal of the first Development Permit. This plan shall <br /> incorporate funding from the Educational Specification Process and A school facilities master plan has been <br /> S SCHOOL develop detailed cost estimates and shall specify the phased funding, prepared by Lammersville School <br /> FACILITIES planning, design approvals, construction and opening of school District which has been approved by the <br /> 107 5.3(1) PLAN facilities and detailed provision of other required services. Y State Architect. None. <br /> The project Description indicates that the <br /> Interim Facilities. Initial Specific Plan students shall be provided for Lammersville School District and the <br /> by the addition of relocatable classrooms, support facilities and Tracy Joint Union High School District <br /> buses at existing facilities of the Lammersville and Tracy Joint will receive development fees for interim <br /> S SCHOOL Union High School Districts. Provision of interim facilities at school services and facilities. Please see <br /> FACILITIES existing schools shall be required until sufficient capacity and all project description and school <br /> 108 5.3(1)a PLAN grade levels are open within the Specific Plan schools. Y agreements. COA- 16 <br /> 09/29/2000 SP-924(finatFINDINGS) Page27 <br />