Laserfiche WebLink
MOUNTAIN HOUSE <br /> SPECIFIC PLAN 1 CONSISTENCY FINDINGS <br /> Section Consist- Conditions <br /> Heading ency Finding of Fact and Evidence of of Approval <br /> 1 # Title Text Y/N/NA Compliance (COA) <br /> The Master Plan describes school support facilities and services <br /> including student transportation, K-8 operational support, and <br /> administrative offices. Within the Specific Plan Area, the Old River <br /> Industrial Park subarea includes a school corporation yard/service <br /> area consisting of up to five acres each for K-8 and high school <br /> needs, for a total of 10 acres(see Figure 13.3: Wastewater <br /> Treatment and Public Use Site Area). This acreage and funding for <br /> appropriate facilities shall be provided to serve the needs of both the Neighborhood F complies with Master <br /> Elementary and High School Districts. Facilities may include a Plan requirements. Please see Master <br /> SUPPORT corporation yard, receiving/warehouse, maintenance and operations, Plan Consistency Findings. Old River <br /> FACILITIES/ service vehicle and food service vehicle storage and possible central Industrial Park is not a part of this <br /> 115 5.4(I) SERVICES kitchen services and transportation services. Y application. COA-1, 15 <br /> As described in the Master Plan,day and after school child care <br /> facilities are encouraged to locate within the community at sites <br /> which are easily accessible to residents and workers,and which are <br /> appropriate for child care uses. Sites adjacent to the K-8 schools are <br /> logical and preferred locations for child care centers. The Master <br /> Plan requires three one-acre child care centers within the The Project Description states that there <br /> community, situated to evenly serve the population. The first is will be a parcel of land available for <br /> required to locate in the Neighborhood Center of Neighborhood F construction of child care facilities as <br /> CHILD CARE and shall be developed when the school is built, as detailed in the part of the school site. Please see Project <br /> 116 5.5(1) PROVISIONS Special Purpose Plan. Y Description. COA-17 <br /> Library services for Specific Plan 1 will initially consist of a <br /> LIBRARY bookmobile. The first phase of the permanent branch library will be The CSD is contracting with the County <br /> 117 5.6(1) SERVICES constructed prior to completion of Specific Plan I buildout. Y to provide library services. None. <br /> CHAPTER SIX: <br /> PUBLIC HEALTH <br /> 118 6 AND SAFETY <br /> 09/29/2000 SP-924(finaIFINDINGS) Page30 <br />