Laserfiche WebLink
MOUNTAIN HOUSE <br /> SPECIFIC PLAN 1 CONSISTENCY FINDINGS <br /> Section Consist- Conditions <br /> Heading ency Finding of Fact and Evidence of of Approval <br /> I # Title Text Y/N/NA Compliance (COA <br /> The special-status species surveys conducted as part of the Master <br /> Plan identifies the following species as potentially occurring within <br /> the Specific Plan Area: northern harrier, black-shouldered kite, <br /> burrowing owl, and Western pond turtle. With preservation and <br /> enhancement of Mountain /louse Creek, habitat for the Western <br /> pond turtle(which has not been observed along Mountain House <br /> Creek in surveys conducted to date)will be improved. No work is proposed within Mountain <br /> Implementation measures are specified in the Master Plan. House Creek except to raise existing <br /> Other Special- dams. These species are addressed under <br /> 166 7.2.4(1) Status Species Y the Initial Study,COA BIO-3. None. <br /> CULTURAL <br /> 167 7.3 RESOURCES <br /> The results of these surveys in late 1996 confirmed that there were <br /> no significant prehistoric or historic resources within the boundaries <br /> of Specific Plan I. The requirement for a site specific <br /> CULTURAL reconnaissance along the raw water intake and pipeline alignment <br /> 168 7.3(1) RESOURCES has been completed. N/A NA <br /> CHAPTER <br /> EIGHT: ENERGY <br /> AND <br /> TELECOMMUNI- <br /> 169 8 CATIONS <br /> 170 8.1 ENERGY Master Plan provisions are not repeated in this Specific Plan. N/A <br /> Figure 8.I: Electrical Distribution System, shows the proposed The Project Description states that the <br /> layout of the"backbone"electrical power distribution system for the CSD will provide electricity through <br /> Specific Plan Area. The layout of the electrical power system for contract with the Modesto Irrigation <br /> the Specific Plan Area shall be in general conformance with the District(MID). The CSD will be <br /> layout shown in the Master Plan. responsible for ensuring compliance with <br /> this requirement. Please see project <br /> 171 8.1.1(1) Electricity Y description. COA-I, 5 <br /> 09/29/2000 SP-924(finaIFINDINGS) Page41 <br />