Laserfiche WebLink
MOUNTAIN HOUSE GENERAL PLAN CONSISTENCY FINDINGS <br /> Project Action or <br /> Consis- Conditions o <br /> Section tency Finding of Fact/Analysis Approval <br /> 1 Heading# Title Text Y/N/NA and Evidence of Compliance (COA) <br /> The following shall be minimum requirements for <br /> stormwater drainage facilities for the approval of <br /> tentative maps and may also be necessary for other <br /> discretionary applications. Urban Communities Public <br /> drainage system,with terminal drainage unless a <br /> Infrastructure Master Drainage/Special Purpose Plan permits TheStormwater Plan for the proposed project includes <br /> Services: retention ponds. On-site drainage may be permitted in the following: construction of a series of interim storm <br /> Stormwater Rural Residential designations if parcels are two acres water protection ditches,berms and retention basins COA-94,95, <br /> 32 IV,D,3,P(I) Drainage or more. Y and build-out level storm water conveyance facilities. 96,97 <br /> Infrastructure <br /> Services: A Community Services District has been established to <br /> Stormwater Public stormwater drainage systems shall be provided service the Mountain House Community and will <br /> 33 1V,D,3,P(2) Drainage by either existing public agencies or new districts. Y operate and monitor stormwater facilities. None <br /> The Mountain House Creek corridor's natural <br /> stormwater drainage capabilities will be enhanced, <br /> while protecting its wildlife habitat and recreation <br /> values. All flood protection improvements along <br /> Mountain House Creek are to be designed to stay out <br /> Infrastructure of the jurisdictional boundaries of the Army Corps of <br /> Services: Use of natural or nonstructural stormwater drainage Engineers. All creek crossings required by the <br /> Stormwater systems shall be encouraged to preserve and enhance proposed project(i.e.,pipelines)are planned as "jack- COA-31,34, <br /> 34 IV,D,3,P(4) Drainage the natural features of a site. Y and-bore"crossings underneath the Creek. 94 <br /> Infrastructure <br /> Services: Stormwater ponds/retention basins will be integrated <br /> Stormwater Recreational and visual opportunities shall be into the Mountain House Creek Community Park as <br /> 35 I V,D,3,P(5) Drainage considered in the design of stormwater ponds. Y recreational amenities. COA-94,97 <br /> The Mountain House CSD will provide waste <br /> management services for the neighborhood. In <br /> accordance with the Specific Plan I and CSD <br /> requirements,the developer will make available for the <br /> Infrastructure CSD,at the CSD's discretion,sufficient land within the <br /> Services: Solid All development shall be consistent with the County's Old River Industrial Park area,for waste transfer and COA-102, <br /> 36 IV,D,4,P(7) Waste Disposal Waste Management Plans. Y composting functions. 107, 108 <br /> 09/29/2000 Page 12 MHGP.CHECKLIST9-28-2000 <br />