My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014674
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
20043
>
2600 - Land Use Program
>
SU-00-03
>
SU0014674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:34:36 PM
Creation date
6/16/2022 3:22:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014674
PE
2600
FACILITY_NAME
SU-00-03
STREET_NUMBER
20043
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
APN
20908020
ENTERED_DATE
12/21/2021 12:00:00 AM
SITE_LOCATION
20043 MOUNTAIN HOUSE PKWY
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1021
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MOUNTAIN HOUSE GENERAL PLAN CONSISTENCY FINDINGS <br /> Project Action or <br /> Consis- Conditions o <br /> Section tency Finding of Fact/Analysis Approval <br /> 1 Heading# Title Text Y/N/NA and Evidence of Compliance (COA) <br /> The proposed project includes plans for specific <br /> transportation system improvements that are to be built <br /> in phases according to levels of service and access <br /> Transportation: requirments for each incremental phase. Actual <br /> Transportation improvements for the site are to be constructed by the <br /> System Design CSD via developers'payment of roadway impact fees COA-20,21, <br /> and Development shall provide transportation system or by Trimark with fee credits being taken for actual 49, 50, 52, <br /> 47 IV,F,I,P(8) Management improvements necessary to serve the development. Y improvements being constructed. 62,63,64 <br /> Transportation facilities are planned to accommodate <br /> the needs of the land uses indicated. These needs have <br /> Transportation: been determined through detailed traffic studies. <br /> Transportation Transportation facilities are to be constructed in phases <br /> Coordination according to levels of service and access requirements <br /> 48 I V,F,2,0 with Land Use To coordinate transportation and land use planning. Y for each incremental phase of the proposed project. COA-62,63 <br /> Commercial, industrial,and high density residential <br /> zoned areas are situated on arterial roadways that are <br /> Transportation: able to support the traffic demand of these areas. In <br /> Transportation addition, the residential, school,and park areas will <br /> Coordination The transportation system shall support the attainment also be served by collector roadways designed to meet <br /> 49 I V,F,2,P(1) with Land Use of desired land use patterns. Y the needs of these land uses. See 947 <br /> Transportation improvements shall be scheduled to <br /> coordinate with land use development and <br /> Transportation: transportation demand. Transportation investments <br /> Transportation and service capacity shall be planned to correspond to <br /> Coordination the development and travel demand identified by plans <br /> 50 IV,F,2,P(2) with Land Use of local communities. Y See#47 and#48. See 447 <br /> 09/29/2000 Page 16 MHGP.CHECKLIST9-28-2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.