Laserfiche WebLink
$1,500/acrex 405 acres= $607,500.00 <br /> The fee shall be placed into an interest bearing trust account of the County. Funds only <br /> under item b) above shall be transferred to the JPA for the SJMSCP once it has been <br /> established. The balance of funds in the trust account shall be reimbursed to the <br /> developer. If the SJMSCP is not adopted within 5 years of the date of approval of this <br /> Tentative Map or if the SJMSCP has been invalidated by any court of competent <br /> jurisdiction, then the fees collected above shall be used to reimburse the developer for <br /> acquiring appropriate mitigation consistent with HMP criteria contained in the Mountain <br /> House Swainson Hawk HMP and Mountain House Master Plan. Timing:condition shall <br /> be met prior to issuance of grading permits. [Mit Neg Dec COA BIO-1, SU-98-04 COA <br /> if] <br /> 33. Preconstruction Surveys and Incidental Take Avoidance Measures: A preconstruction <br /> survey consistent with the requirements of SJMSCP,Master Plan Appendix 7-C and <br /> protocols established by State and Federal Wildlife Agencies shall be conducted within <br /> two calendar weeks prior to ground disturbance to cover kit fox as well the remainder of <br /> the covered species. The pre-construction surveys shall be conducted by a qualified <br /> biologist.All applicable Incidental Take Avoidance Measures described in Section 5.2 of <br /> the SJMSCP and the preconstruction surveys shall be implemented. Timing:condition <br /> shall be met prior to issuance of grading permits. [Mit Neg Dec COA BIO-1, SU-98-04 <br /> COA Id,e] <br /> 34. Biotic Habitat-Infrastructure: Any and all legally required permits and approvals shall <br /> be obtained for infrastructure improvements serving Neighborhood F to meet <br /> requirements of the U.S. Army Corps of Engineers, California Department of Fish and <br /> Game and the California Regional Water Quality Control Board. In addition, Applicant <br /> shall incorporate Best Management Practices to control non-point sources of pollution <br /> and construct detention basins on the inboard side of the river levee. Timing: <br /> Improvement plans, condition shall be met prior to issuance of first Final Map. [project <br /> proposal,Mit Neg Dec COA BI04] <br /> CULTURAL RESOURCES <br /> 35. Construction/grading activities: If, during the course of any grading activity or <br /> construction, subsurface archaeological features are uncovered anywhere within the <br /> project site, work shall be immediately halted in the vicinity of the find and a qualified <br /> archaeologist shall be consulted for an onsite evaluation. Such evaluation may entail <br /> archaeological test excavation and/or mitigative data recovery. The County Coroner, the <br /> Native American Heritage Commission, and an archaeologist shall be informed and <br /> consulted if a human prehistoric burial site is discovered during site construction. An <br /> agreement shall be formulated between the Native American representative, the <br /> archaeologist, San Joaquin County, and the developer with regard to the proper treatment <br /> and disposition of human remains and associated artifacts. Such treatment and <br /> disposition may require archaeological excavation and reburial. [Development Title <br /> Chapter 9-1053M, Mit Neg Dec COA Cult-1, SU-98-04 COAs lg,-i.] <br /> II. COUNTY COUNSEL (Staff Contact: Mike McGrew, 468-2980) <br /> 36. HOLD HARMLESS PROVISION: Pursuant to Section 66474.9 of the Government <br /> Code, the subdivider shall defend, indemnify, and hold harmless the local agency or its <br /> 09/29/00 7 <br />