My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0014674
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
M
>
MOUNTAIN HOUSE
>
20043
>
2600 - Land Use Program
>
SU-00-03
>
SU0014674
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/16/2022 4:34:36 PM
Creation date
6/16/2022 3:22:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0014674
PE
2600
FACILITY_NAME
SU-00-03
STREET_NUMBER
20043
STREET_NAME
MOUNTAIN HOUSE
STREET_TYPE
PKWY
City
TRACY
APN
20908020
ENTERED_DATE
12/21/2021 12:00:00 AM
SITE_LOCATION
20043 MOUNTAIN HOUSE PKWY
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1021
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R I STREET LIGHT R <br /> 104' <br /> 1 57' 47' <br /> 20' 2Y 10' <br /> TYPE 83 CURB PER CALTRANS STD <br /> 2OX AC IX AC PAVEMENT <br /> I <br /> l — TYPE 'F' CURB do APRON ? """" �1� <br /> 311�fF3f� ------ ---- — AGGREGATE BASE <br /> IX GROUND J AGGREGATE SUB—BASE <br /> VERTICAL CURB do GUTTER <br /> R <br /> 104, R <br /> 57' 4r <br /> 2' 10' 10' 2Y 10' <br /> i <br /> 2.0% 2.0% <br /> ------------ ?lel i <br /> LANDSCAPING <br /> SIDEWALK <br /> RI R/W <br /> 104' <br /> 5r 47' <br /> 2' 10' 10' 2Y 10' 10' 27 10' <br /> 2oz 2-0% L <br /> �� <br /> ti <br /> I ---------- <br /> T1FF-------- <br /> MOUNTAIN HOUSE PARKWAY <br /> NOTES: NOT TO SCALE <br /> 1. AS PART OF FIRST PHASE OF NEIGHBORHOOD 'F', THE TWO SOUTH BOUND LANES WILL BE CONSTRUCTED FROM <br /> MASCOT BOULEVARD TO MOUNTAIN HOUSE BOULEVARD, THE LANES WILL TRANSITION TO THE EXISTING LANES <br /> PAST THE INTERSECTIONS, AND THE EXISTING TWO LANES WILL BE USED AS A TURNING LANE AND ONE NORTH <br /> BOUND LANE. <br /> E <br /> 2. THE FINAL NORTH BOUND LANES ARE NOT REQUIRED FOR THE BUILDOUT OF NEIGHBORHOOD 'F'. <br /> s 3. LANDSCAPING ALONG WEST EDGE WILL BE INSTALLED NO LATER THAN ADJACENT PARCEL DEVELOPMENT. <br /> 4. MEDIAN LANDSCAPING WILL BE INSTALLED WHEN FINAL MEDIAN IMPROVEMENTS ARE CONSTRUCTED. <br /> P <br /> i <br /> E <br /> 5. EAST EDGE LANDSCAPING WILL BE INSTALLED WHEN FINAL NORTH BOUND LANES ARE INSTALLED. <br /> n <br /> n <br />
The URL can be used to link to this page
Your browser does not support the video tag.